 Year  Name of Project  Characteristics of Project  Client
2017-Present Detailed Design of Koudiat El Mahcha Dam and Detailed Design of the Transmission Line from the Treated Water from Annaba WWTP to Koudiat El Mahcha Dam in the Wilaya of Annaba - Algerian a rockfill dam with clay center creating a reservoir of 13 Hm3 at a normal altitude of 116.00 m. Maximum height 29.80m - crest length 658 m - width 6.60m - capacity 10 Hm3 - transmission line length of 35 km from Annaba WWTP to the Dam.
- Mission 1 – Definition alternative for transmission, dam and program of investigations;
- Mission 2 – hydrological study;
- Mission 3 – geological, geotechnical and seismic studies;
- Mission 4 – Comparison between alternatives;
- Mission 5 – Detailed design of the adopted alternative and preparation of tender documents for the construction works;
- Mission 6 – Physical Hydraulic Model Study;
- Mission 7 – Risk analysis study at the downstream of the dam in case of dam failure;
- Mission 8 – Environmental impact assessment and water quality study;
- Mission 9 – Profitability study;
- Mission 10 – Water basin treatment study.
National Agency for Dams and Transfers (ANBT)
2018-Presentc Design of a Medium Sized Hill Lake in Blaouza – Bcharri – North Lebanon - Feasibility study including topographical survey, hydrological, geological and geotechnical studies
- Detailed design including Detailed geotechnical and geological investigations and studies
- Tender documents and drawings.
Medium sized hill lake in Blaouza (35,000 m3).
Economic and Social Fund for Development (ESFD)
2017-Present Supervision of the Construction of Menjez Hill Lake – Akkar – Lebanon Medium sized hill lake in Menjez (50,000 m3) including geomembrane. Dam Height 11 m; Dam Length 60 m Green Plan
2016-Present Design and Supervision for the Construction of Hill Lakes and Irrigation Canals - Lebanon - Feasibility study including topographical survey, hydrological, geological and geotechnical studies
- Detailed design including detailed geotechnical and geological investigations and studies
- Tender documents and drawings
- Supervision of construction works
For the following projects:
- Medium sized hill lake in Beit Younes (50,000 m3);
- Medium sized hill lake in El Qaa (100,000 m3);
- Irrigation canals in Donniyeh with a total length of 6km;
- Rehabilitation of spring and reservoir structures and development of new irrigation scheme in Ain Ebel;
- Solar power pumping systems (30 KW and 60 KW) in Jbaa.
Economic and Social Fund for Development (ESFD)
2015-Present Design of Medium-Sized Hill Lakes in Lebanon
Lot N°4 - Bechenata and Tarchich"

- Feasibility study including topographical survey and Hydrological , geological and geotechnical studies
- Initial Environmental Examination (IEE)
- Detailed study including surveys and geotechnical and geological studies
- Tender Documents and Drawings

Green Plan
2015-Present Design of Medium-Sized Hill Lakes in Lebanon - Feasibility study including topographical survey and Hydrological , geological and geotechnical studies
- Initial Environmental Examination (IEE)
- Detailed study including surveys and geotechnical and geological studies
- Tender Documents and Drawings
Green Plan
2015-Present Study of Hill Lakes in Menjez and Karm El Mohr - Akkar and Denniyé - Lebanon - Feasibility study including topographical survey and Hydrological , geological and geotechnical studies
- Detailed study including surveys and geotechnical and geological studies
- Tender Documents and Drawings
Green Plan
2015 Supervision of Ehmej Hill Lake - Caza of Batroun - Lebanon - Earthworks
- Dam Elevation: 9m, Reservoir capacity: 32,000 m³
- Used for irrigation purpose
- Installation of 407 g/m² Geotextile - surface of 11,600 m²
- Installation of 1.5 mm HDPE geomembrane - surface of 9,450 m²
- Water Intake pipe, Spillway, Roads and other networks
Green Plan
2015 Supervision of Tannourine Hill Lake - Caza of Batroun -Lebanon - Earthworks
- Dam Elevation: 9m, crest level at +2274 m, Reservoir capacity: 30,000 m³
- Used for irrigation purpose
- Installation of 407 g/m² Geotextile - surface of 8,920 m²
- Installation of 1.5 mm HDPE geomembrane - surface of 8,920 m²
- Water Intake pipe, Spillway, Roads and other networks

- Vidange par un conduit, Déversoir, VRD
Green Plan
2014 Supervision of Ehden Hill Lake - Caza of Zgharta – Lebanon - Earthworks
- Dam Elevation: 9m, crest level at +2006 m, Reservoir capacity: 20,000 m³
- Used for irrigation purpose
- Installation of 407 g/m² Geotextile - surface of 7,320 m²
- Installation of 1.5 mm HDPE geomembrane - surface of 7,320 m²
- Water Intake pipe, Spillway, Roads and other networks
Green Plan
2012-Present Wadis Rijma and Al-Zhimi - Sultanate of Oman - Review of the existing Feasibility study
- Selection of the Dam location
- Implementation of flood protection scenarios, geological and geotechnical investigation works, environmental impact assessment
- Preliminary and detailed study of the following flood control dams:
1- R5 : earth fill dam, length of 1,850 m, maximum height 25 m
2- R2a : earth fill dam, length of 2,480 m, maximum height25 m
3- Z1 : RCC Dam, length of 261 m, maximum height 43 m
4- Z4c : earth fill dam, length of 660 m, maximum height 20 m
- Preparation of the tender documents
Ministry of Regional Municipalities and Water Resources
2012 Supervision of Aarouba Hill Lake - Caza of Hermel - Lebanon - Excavation: V = 195 000 m³, Dam height: 15m, crest level at +1787.00 m
- Reservoir capacity: 0,12 million m³ 
- Used for irrigation purpose
- Permeability is ensured by two clay layers (30 cm each)
- Water Intake pipe, Spillway, Roads and other networks
Green Plan
2012 Supervision of Mristi Hill lake - Caza of Chouf - Lebanon - Natural limestone reservoir at +1676 m
- water level height: 8m, Reservoir capacity: 50,000 m³
- Used for irrigation purpose
- Installation of 500 g/m² Geotextile - surface of 15,000 m²
- Installation of 2.00 mm HDPE geomembrane - surface of 15,000 m²
-Overflow and Weir, Roads and other networks
Green Plan
2012 Supervision of Dimane Hill Lake - Caza of Bcharreh - Lebanon - Earthworks: V= 190,000 m³
- Dam height: 15m, crest level : +1817, Reservoir capacity: 0.12 Million m³
- Used for irrigation purpose
- Installation of 500 g/m² Geotextile - surface of 21,300 m²
- Installation of 2.00 mm HDPE geomembrane - surface of 21,300 m²
- Washout, Weir, Roads and other networks
Green Plan
1996-1998
Updated 2008
Detailed Study of Qaissamani Dam - Lebanonn - Rock fill dam
- H=30m – L=200m
- Reservoir capacity of 1.05 million m³ in the new location
- Water Outlet, Washout, Weir.
Coordination with "Coyne et Bellier"
Ministry of Energy and Water
2007-2009 Damour Dam Feasibility study- Lebanon - Roller compacted concrete (RCC), (L = 260m, H = 95m), Capacity = 40 million m³,
- Drainage surface: 210 Km²,
- Used for potable water and irrigation purposes
CDR
2004-2008 Mseilha dam study - lebanon Detailed study of Mseilha Dam (including topographical survey, Geological, geotechnical, hydrological, hydrogeological studies, Seismic study, etc...), Tender documents.
- Dam with a reservoir capacity of 6 million m3,
- Earth fill and rock fill dam, height of 43 m, length of 450 m , 
- Overflow with a discharge capacity of 800 m3/s, Water Outlet at 3 levels, Washout structure.
Ministry of Energy and Water
2004 Detailed study of  Mristi Hill Lake - Lebanon Feasibility study, Preliminary and final studies, environmental impact assessment and tender documents.
- Natural reservoir, Water maximum height of 8m, Volume of 50,000 m³,
- Permeability is ensured by surface layer compaction and installation of a geomembrane.
Green Plan
2004 Detailed study of Dimane Hill Lake - Lebanon Feasibility study, Preliminary and final studies, environmental impact assessment and tender documents.
- Hill lake, rock fill dam with 15 m height, Reservoir capacity of 0.12 million m³,
- Derivation of a water course to fill the lake
- surface overflow
Green Plan
2004 Detailed study of Aarouba Hill Lake - Lebanon Feasibility study, Preliminary and final studies, environmental impact assessment and tender documents.
- Hill lake, rock fill dam with 15 m height, Reservoir capacity of 0.12 million m³,
- Derivation of a water course to fill the lake
- surface overflow
Green Plan
2003-2008 Supervision of Chabrouh Dam construction works - Rock fill dam with a Bituminous concrete protection layer, height of 63 m, Length of 450 m ,
Coordination with "Coyne et Bellier", France.
Ministry of Energy and Water
1999 Study of  Azzibe Dam, Jezzine - Lebanon Technical and feasibility studies, preliminary study of a rock fill dam, used for potable water and irrigation purposes.
Dam characteristics : H = 39m, reservoir capacity = 0.35 Mm3.
(Study done in 1979 and reevaluated in 1999).
Ministry of Hydraulic and Electrical Resources
1999 Study of five Hill Lakes in different locations in Lebanon Preliminary and feasibility studies for the hill lake for potable water purposes. .
Hauteur entre 18 et 25 m.
- Topographical studies for the different sites, hydrological study, Geological Survey, etc.
Ministry of Hydraulic and Electrical Resources
1992 Study and Supervision of Tannourine Dam Earth fill dam: H=22m, Reservoir Capacity = 0.2 m³. N. Younes
1986-1990 Detailed Study of Chabrouh Dam - Dam with a reservoir capacity of H91 8 million m³,
- Rock fill dam with a Bituminous concrete protection layer, height of 63 m, Length of 450 m ,
- Overflow in tulip form with a discharge capacity of H92180 m³/s,
- Water intake wells, Tunnel with 2,000 m length and diameter of 3 and 4.6m,
- Water diverted from Nabaa Laban to Chabrouh of 1.8 m³/s,
- Water treatment plant with a capacity of 60,000m³/day.
Ministry of Hydraulic and Electrical Resources
1986 Detailed Study of Nahr Arqa Dam Technical study and execution drawings, technical specifications and tender documents for a derivation dam at Arqua with a water outlet at the river.
Feeding pipe with an irrigation network with a flow of 1m³/s, and diameter of 900 mm. L= 6 Km.
Ministry of Hydraulic and Electrical Resources
1969 Dam at Assi River, Ain Zarka - Lebanon Technical study, execution drawings, Technical specifications and tender drawings with "Coyne et Bellier" experts intervention for an arch dam for the partial derivation of Assi river flow for irrigation and energy purposes. characteristics:L= 52m ; H= 20 m. Ministry of Hydraulic and Electrical Resources
1968 Derivation Dam at Litani river - Lebanon Technical study, execution drawings, technical specifications and tender documents for Litani river derivation dam toward a pumping station and a treatment plant.
Concrete diversion dam characteristics: l = 50m ; H= 7 m.
Ministry of Hydraulic and Electrical Resources
1967 Water Table recharge at Hadath region - Lebanon Technical study, execution drawings, technical specifications and tender documents for water table recharge works of the water intake from a small concrete dam existing on Beyrouth river". Ministry of Hydraulic and Electrical Resources
 

Environment

 

 Year  Name of Project  Characteristics of Project  Client
 2018-Present Supervision Services for the Construction and Operation of Tripoli Sanitary Landfill for Municipal Solid Waste Supervision of construction works and operation phase for the:
- Implementation of marine protection works (mainly breakwater)
- Backfilling of reclaimed marine areas for the implementation of: Tripoli sanitary landfill (approximate area of 60,000 m2)
- Construction of sanitary landfill for landfilling of wastes remaining after sorting in the adjacent sorting plant (foreseen capacity of the project 410,000 T, allowing a period of around 3 years of operation)
- Operation of the Constructed Sanitary Landfill
- Construction and operation of leachate treatment plant
- Construction and operation of landfill gas collection and flaring systems
- Landfill Closure and caping
Council for Development and Reconstruction 
 2018 Environmental Management Plan for Bourj Hammoud and Jdaideh Sanitary Landfills Environmental Management Plan for the following components:
- Treatment and removal of the Bourj Hammoud old dump.
- Implementation of marine protection works (mainly breakwater) for the marine areas facing Bourj Hammoud and Jdaideh / Baouchrieh / Sedd regions.
- Backfilling of reclaimed marine areas for the implementation of:
- Temporary sanitary landfills (Bourj Hammoud dump area: 126,400 m2 ; Jdaideh dump area: 122,700 m2
- Foreseen wastewater treatment plant
- Public areas allocated for municipal public use by Bourj Hammoud and Jdaideh/ Baouchrieh / Sedd as well as for future marine highway
- Relocation and reorganization of existing oil and gas sealines
- Construction of temporary sanitary landfills for landfilling of wastes remaining after sorting in Karantina sorting plant and composting in Coral composting plant (current capacity 300 T/d with future extension to 750 T/d).
- Construction and operation of two leachate treatment plants in Bourj Hammoud and Jdaideh
- Construction and operation of two landfill gas collection and flaring systems in Bourj Hammoud and Jdaideh
Council for Development and Reconstruction 
 2017 Design of the Solid Waste Sanitary Landfill in Srar - Akkar - Lebanon - Detailed design, preparation of the detailed execution drawings and tender documents pertaining to the solid waste sanitary landfill in Srar with all necessary leachate extraction and collection networks, leachate pond, biogas extraction and collection, drainage network, administrative and operation buildings, roads and infrastructure networks, landscaping and closure plan. Council for Development and Reconstruction 
2016-2017 Environmental Impact Assessment (EIA), Detailed Design and preparation of tender documents for the construction and operation of Bourj Hammoud & Jdaideh sanitary landfills and coordination with fuel and gaz companies for proposition of solutions about their pipes on the site. - Treatment and removal of the Bourj Hammoud old dump.
- Implementation of marine protection works (mainly breakwater) for the marine areas facing Bourj Hammoud and Jdaideh / Baouchrieh / Sedd regions.
- Backfilling of reclaimed marine areas for the implementation of: temporary sanitary landfills (Bourj Hammoud dump area: 126,400 m2 ; Jdaideh dump area: 122,700 m2, foreseen wastewater treatment plant, public areas allocated for municipal public use by Bourj Hammoud and Jdaideh / Baouchrieh / Sedd as well as for future marine highway
- Relocation and reorganization of existing oil and gas sealines
- Construction of temporary sanitary landfills for landfilling of wastes remaining after sorting in Karantina sorting plant and composting in Coral composting plant (current capacity 300 T/d with future extension to 750 T/d).
- Construction and operation of two leachate treatment plants in Bourj Hammoud and Jdaideh
- Construction and operation of two landfill gas collection and flaring systems in Bourj Hammoud and Jdaideh
The works incude:
- Environmental Impact Assessment
- Detailed design including topographic and bathymetric surveys, geotechnical investigations, detailed designs and drawings
- Tender documents (including administrative conditions, technical specifications, bill of quantities and execution drawings), pertaining to the project components stated above.
- Physical Scale model in order to verify the stability of marine breakwater as well as overtopping.
Council for Development and Reconstruction
 2014-2017 Design and Supervision for the Solid Waste Facility in Bar Elias, Bekaa, Lebanon Design and Supervision of a Solid Waste Facility in Bar Elias:
- Sorting and Composting plant: 150 TPD, Dump area: 37,000 m²
- Leachate exctraction and collecttion
- Leachate pond: 5,200 m³
- Biofilter Odor Control System
 Economic and Social Fund for Development 
 2014-2015 Design and Supervision of Construction of an Engineered Landfill in Buraimi, Sultanate of Oman The study consists of a undertaking the detailed design including all execution drawings (civil, electrical, mechanical and architectural) and required technical documents, BOQ and techincal specifications for the sanitary landfill in Buraimi (Governorate of Al Buraimi, Sultanate of Oman).
- Dump area: 216,000 m²
- Leachate exctraction and collecttion
- 2 Leachate pond: 2,500 m³ each
- Landfill capacity for phase I: 500,369 m³
- Total Landfill capacity: 2,470,120 m³
Oman Environmental Services Holding Company (Be’ah) 
 2013-2015 Supervision of the Closure and Rehabilitation of the Old Dump of Berka Zerga (Annaba) - Algeria CSupervision of the closure and rehabilitation of the Annaba old dump:
- Dump area: 200,000 m²,
- Leachate extraction and collection,
- Biogas collection and incineration (Capacity: 500 Nm³/h),
- Geomembrane VLDPE 200,000 m²
Ministry of Urban Planning and Environment
 2013-2016 Supervision of the Closure and Rehabilitation of the Old Dump of Zef Zef (Skikda) - Algeria Supervision of the closure and rehabilitation of the Skikda old dump:
- Area: 40,000 m²,
- Leachate extraction and collection,
- Biogas collection and incineration (Capacity: 500 Nm³/h).
- Geomembrane HDPE 20,000 m² VLDPE 30,000 m², 
- Runoff water drainage 550 lm HDPE pipe
Ministry of Urban Planning and Environment
 2013-Present Supervision of the closure and rehabilitation of the dump of Ouled Fayet - Algeria Supervision of the closure and rehabilitation of the Ouled Fayet dump:
- Area: 250,000 m²
- Leachate extraction and collection (160m³/d),
- Biogas collection and incineration (Capacity: 3,000 Nm³/h).
- Geomembrane VLDPE 250,000 m²
- Runoff water drainage 400 lm HDPE pipe
- Trapezoïdal drainage channel 3,800 lm
Wilaya of Algier – Directorate of Environment
 2009-Present Supervision of the works of rehabilitation of the old dump of Oued Smar and transformation into green space - Algeria Supervision of rehabilitation works of the old dump of Oued Smar
- Area: 420,000 m²,
- Leachate treatment (720m³/d),
- Biogas extraction and incineration (capacity: 2 x 2,500 Nm³/h), Waste to Energy (WTE) Unit,
- Geomembrane VLDPE 430,000 m²,
- Runoff water drainage 2,500 lm concrete pipe,
- Trapezoïdal drainage channel 2,800 lm,
Ministry of Urban Planning and Environment
 2013 Design of Rehabilitation of Boulimat (Bejaia) Landfill  - Algeria The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the rehabilitation of Boulimat (Bejaia) Landfill:
- Area: 200,000 m²
- Biogas extraction and incineration (capacity: 500 Nm³/h),
- Geomembrane VLDPE 80,000 m²
- Leachate storage & rainwater drainage system
-Park and Landscape
Ministry of Urban Planning and Environment
 2013 Design of Rehabilitation of 13th Km (Constantine) Landfill - Algeria The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of 13th Km (Constantine) Landfill:
- Area: 60,000 m²
- Biogas extraction and incineration (capacity: 250 Nm³/h),
- Geomembrane VLDPE 65,000 m²
- Leachate storage & rainwater drainage system
-Park and Landscape
Ministry of Urban Planning and Environment
 2013 Design of Rehabilitation of Bouzourane (Batna) Landfill - Algeria The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Bouzourane (Batna) Landfill:
- Area: 350,000 m²
- Geomembrane VLDPE 173,000 m²
- Biogas static extraction, rainwater drainage
Ministry of Urban Planning and Environment
 2013 Design of Rehabilitation of Mezghitane (Jijel) Landfill - Algeria The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Mezghitane (Jijel) Landfill:
- Area: 65,000 m²
- Geomembrane 25,000 m2
- Biogas static extraction, rainwater drainage system
- Landscape
Ministry of Urban Planning and Environment
 2013 Design of Rehabilitation of Safsaf (Tlemcen) Landfill - Algeria The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Safsaf (Tlemcen) Landfill :
- Area : 100,000 m²
- Geomembrane VLDPE 50,000 m2
- Biogas static extraction, rainwater drainage
- Landscape
Ministry of Urban Planning and Environment
 2013 Design of Rehabilitation of Sidi Haider (Setif) Landfill - Algeria Etude détaillée, plans d'exécution, étude d'impact sur l'environnement et dossier d'appel d'offres de la Réhabilitation de la Décharge de Sidi Haidar (Setif) : Ministry of Urban Planning and Environment
 2013 Design of Rehabilitation of Tigzirt (Tizi Ouzou) Landfill - Algeria The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Tigzirt (Tizi Ouzou) Landfill:
- Area: 40,000 m²
- Geotextile 20,000 m²
- Biogas static extraction, rainwater drainage system'- Landscape
Ministry of Urban Planning and Environment
 2012 Design of Rehabilitation of Tighenif (Mascara) Landfill - Algeria The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Tighenif (Mascara) Landfill:
- Area: 100,000 m²
- Inert waste closure and residential waste collection and transfer
- Landscape
Ministry of Urban Planning and Environment
 2009-2010 Design and supervision for rehabilitation of waste dumps in the Wilaya of Algiers - Algeria - Identification of dumps sites
- Data Collection and Environmental Impact Assessment studies
- Assessment of existing conditions of the dumps
- Undertaking on-site survey: topographical survey, geological and geotechnical surveys
- Evaluation of the results of the investigation survey, and preparation of drawings and reports illustrating the existing dumps conditions
- Carrying out Environmental Impact Assessment studies
- Setting up of environmental criteria and feasibility study
- Setting up environmental criteria
- Carrying out a feasibility study pertaining to the various alternatives for the rehabilitation of the dumps and submission of a preliminary proposal
- Detailed design of dump rehabilitation proposal
- Submission of specific proposals for dumps rehabilitation
- Detailed design of dump rehabilitation
- Preparation of tender documents for dumps rehabilitation projects
- Supervision of execution of dumps rehabilitation projects
Ministry of Urban Planning and Environment
 2009-2013 Supervision , control and monitoring of the construction pertaining to the Sanitary Landfill of Corso  - Algeria - Area: 60 hectares
- Leachate treatment plant with a capacity of 80 m³ per day (permeate)
- Capacity : 7 Millions Tons
Ministry of Urban Planning and Environment
 2009-2013 Supervision , control and monitoring of the construction pertaining to the Sanitary Landfill of Hamici  - Algeria - Area : 110,000 m²
- Leachate treatment plant with a capacity of 80 m³ per day (permeate)
- Capacity : 2 Millions Tons
Ministry of Urban Planning and Environment
 2009-Present Actualisation of the Design and Supervision of the works of rehabilitation of the old dump of Oued Smar and transformation into green space - Algeria. - Area : 400,000 m²
- Leachate treatment plant with a capacity of 720 m³ per day.
- Biogaz Extraction and incineration (capacity : 2 x 2,500 Nm³/h)
Ministry of Urban Planning and Environment
 2008 Closure and Rehabilitation  of the sanitary landfill of Ouled Fayed - Algeria Evaluation of existing situation, detailed design, execution drawings and tender documents preparation:
Dump area: 400,000 m2, Pumping and treatment of leachate (treatment capacity: 160m3/d), captation and treatment of Biogaz (capacity 3,000 Nm3/h)
Wilaya of Alger - Department of Environment
 2007-2008 Closure and Rehabilitation of the Old Dump of Zef Zef (Wilaya of Skikda) - Algeria Evaluation of existing situation, detailed design, execution drawings and tender documents preparation: 
- Dump area: 40,000 m²,
- Leachate collection and pumping,
- Biogas extraction and incineration (Capacity: 500Nm³/h).
Ministry of Urban Planning and Environment
 2007-2008 Closure and rehabilitation of Berka Zerga Landfill (Annaba) - Algeria Evaluation of existing situation, detailed design, execution drawings and tender documents preparation: 
- Dump area: 320,000 m²,
- Biogas extraction and incineration (Capacity: 500Nm³/h).
Ministry of Urban Planning and Environment
 2007-2008 Research and Detailed Study of Sanitary Landfills Sites in the Wilaya of Algiers, and Adjacent Wilayas: Reghaia - Algeria Investigation of potential sites, Environmental impact assessment study, Detailed design and tender documents:
- Landfill capacity: 2.5 Million T,
- Captation of leachate followed by treatment of 80 m³/d,
- Captation and incineration of Biogas.
Ministry of Urban Planning and Environment
2007 Research and Detailed Study of Sanitary Landfills Sites in the Wilaya of Algiers, and Adjacent Wilayas: Hamici -Algeria Investigation of potential sites, Environmental impact assessment study, Detailed design and tender documents:
- Area: 900,000 m2
- Landfill capacity: 10 Million T
- Captation of leachate followed by biological and membrane treatment of 80 m³/d (permeate)
- Captation and incineration of Biogas.
Ministry of Urban Planning and Environment
2006 Research and Detailed Study of Sanitary Landfills Sites in the Wilaya of Algers, and Adjacent Wilayas: Corso - Algeria E'Investigation of potential sites, Environmental impact assessment study, Detailed design and tender documents:
- Landfill Capacity: 15 Million T
- Captation and storage of leachate with treatment with a  capacity of 80 m3/day (permeate)
- Captation and incineration of Biogas
Ministry of Urban Planning and Environment
2006 Study of the Closure and Rehabilitation of the Old Dump of Oued Smar - Algeria Detailed design and tender documents (administrative conditions, technical specifications, execution drawings and bill of quantities):
- Dump area: 400,000 m²
- Leachate treatment via reverse osmosis: 720 m³/d
- Geotextile and HDPE geomembrane complex 420,000 m2 and drainage (geogrid)
- Biogas extraction and incineration (Capacity: 2x 2,500 Nm³/h).
- Stormwater Drainage 2400 m concrete pipe, 2400 m  trapezoïdal shaped trench.
Ministry of Urban Planning and Environment
 2003 Closure of the Kayale Dump - Lebanon Closure and rehabilitation of Kayale old dump including proposed mode of Biogas capitation and treatment as well as partial waste transfer.
Undertaking the environmental assessment of the closure and rehabilitation of the old dump of Kayale, as well as the detailed design including the description of closure and rehabilitation works, which covers the control of the composition and flow of biogas in view of estimating the existing volume and proposed mode of treatment, the possible partial transfer of wastes towards the sanitary landfill under construction (100,000 Eq. Inhabitants), bill of quantities, etc.
Council for Development and Reconstruction
 2003 Construction of Fakiha Transfer Station - Lebanon Distance between transfer station and sanitary landfill: 50 Km.
Undertaking the environmental assessment study of the construction of a solid waste transfer station, as well as the detailed design with description of works, tender documents, bill of quantities, etc.
Mobile transfer equipments, capacity 22 T, 
Council for Development and Reconstruction
2002 Sanitary landfill adjacent to Tripoli wastewater treatment plant - Lebanon Landfill pertaining to receive the humid waste and polluted excavation wastes from a coastal dump Council for Development and Reconstruction
1998-2002 Solid Waste Management Project - Detailed Design - Region No. 1A - Lebanon Preliminary study, EIA, Detailed Design and Tender documents preparation for:
1) Construction of Sanitary landfill of :
- Zahlé, Taybeh (Caza Baalbeck), Amioun.
2) Construction of two transfer stations (Caza of Hermel).
3) Collection and the supply of the necessary mobile equipment for the collection, transfer, and street sweeping for:
- Zahlé, Baalbeck, Amioun.
4) Operation of the street sweeping for the city of Zahlé.
5) Closure and rehabilitation of the old dump of the city of Zahlé.
6) Closure and rehabilitation of the old dump of the city of Baalbeck (Kayal).
Council for Development and Reconstruction
1998-2002 Solid Waste Management Project - Detailed Design - Region No. 1B - Liban Preliminary study, EIA, Detailed Design and Tender documents preparation for:
- Construction of Sanitary Landfills in Tripoli, Jbeil and Qobayat.
'- Supply of Mobile Equipment for the waste collection, street sweeping and landfill operation services.
'- Operation of the waste collection and street sweeping services.
- Operation of the landfill service.
- Closure and rehabilitation of the existing dump in Jbeil.
- Closure and rehabilitation of the existing dump in Tripoli.
Council for Development and Reconstruction
1998-2002 Solid Waste Environmental Management Project - Construction and Supply Works - Lebanon Sanitary landfill of the city of Zahlé (50,000 T/y), supply of mobile equipment for waste collection and street sweeping. Council for Development and Reconstruction
1998-2002 Solid Waste Management Project - Operation Services - Lebanon The project consists on the supervision of operation, collection, cleaning and different treatment centers for solid waste in Lebanon. Mount Lebanon, North Lebanon and Bekaa. The total treated quantity is 350,000 T/year. (Main landfills: Tripoli, Zahlé). Council for Development and Reconstruction
1996 Rehabilitation, Closure and Operation of the Tripoli Dump - Lebanon Supervision of civil works
Design and supervision of electromechanical works
Council for Development and Reconstruction
1995 Consultant services for a solid waste management plan for Lebanon Global solid waste management plan for Lebanon (excluding Greater Beirut)
- Technical specifications and tender documents preparation for the operation of collection services, roads cleaning including construction, equipment and operation of transfer plants.
- Design, typical drawings, technical specifications and tender documents for the construction and operation of landfills.
- Technical specifications and tender documents for the furniture of containers, tracks and mobile equipment for transfer plants and landfills.
- Impact study of such project on the Country,
- Supervision of works
Council for Development and Reconstruction
1995 Environmental Impact Assessment for the Studies for the Implementation of Six Landfills - Lebanon Etude d'impact sur l'environnement de six sites de décharges contrôlées de capacité variant entre 20,000 et 100,000T/an. Council for Development and Reconstruction
1995 Study to develop a long term strategy for solid waste management in Lebanon - Lebanon Examen de l'état du secteur des déchets solides et recommandations pour la mise en place d'un plan de gestion de ce secteur au Lebanon en 4 phases :
- Phase I : Analyse de la situation existante,
- Phase II : Amélioration du secteur,
- Phase III : Recommandation pour la récupération des coûts par habitant,
- Phase IV : Projet de législation.
Council for Development and Reconstruction
1995 Environmental impact assessment study for an incineration - composting complex at Amroussieh - Lebanon Environmental Impact Assessment of an existing incineration plant in Amroussieh (72,000T/y) along with a foreseen composting complex (60,000T/y) in conformity with the World Bank specifications.
(Operational Directive n° 4.01)
Council for Development and Reconstruction
1994 National Emergency Recovery Program: Consulting Services for Sanitary Landfills - Lebanon Design and supervision of the first sanitary landfills in differents regions of Lebanon:
- Preliminary research for 10 sites,
- Detailed final design for the sanitary landfill of Baalback including tender documents preparation,
- Design and supervision of Tripoli landfill (110,000T/y).
Council for Development and Reconstruction
1994 Environmental impact assessment study for a solid waste project in Lebanon Carrying out EIA studies according to the World Bank's O.D. 4.01, for each of the following :
- Composting Plant in Saida,
- Composting Plant in Zahlé,
- Extension of the incineration plant in Amroussieh.
Council for Development and Reconstruction
1993 Design of sanitary landfills throughout 13 cazas - Lebanon Preparation of Tender Documents, Supervision of works, in joint venture with CREED - France. Council for Development and Reconstruction
1992 National Emergency Recovery Program - Solid Waste: Damage Assessment of the Solid Waste Sector - Lebanon Evaluation of the existing situation of the Solid waste sector in Lebanon
In joint venture with CREED - France
Council for Development and Reconstruction
1974 Solid waste treatment plant in Furn Al Chabbak - Beirut - Lebanon Detailed design and execution drawings for treatment plant with a capacity of  140T/day. Built area: 4,000 m2. Municipality of Furn El Chebbak
1972 Beirut solid waste treatment plant at Karantina - Beirut - Lebanon Preliminary Design for a solid waste  treatment Plant with capacity of 600 T/day. Built area = 10,000 m². Municipality of Beyrouth
1971 General studies for the  solid waste treatment in Lebanon (excluding Beirut and suburbs) Treatment of solid waste in various Lebanese cities excluding Beirut Ministry of Public Works, General Directorate of Town Planning.
 

 

Potable Water


 Year  Name of Project  Characteristics of Project  Client
 2018-Present Approval of Execution Drawings, Technical Assistance and Supervision of Works Related to the Project « Execution Studies and Construction of Water Transmission Lines for the Potable Water Agency of Ain Ferrah, Oued El Abtal and Sidi Abd Eldjebar from TAHT Dam (Wilaya of Mascara) - Algeria Approval of execution drawings, technical assistance and supervision of construction works for the following project components:
- Water treatment plant with a capacity of 12,500 m3/day
- Pumping stations
- Reservoirs
- Transmission pipelines
- Remote management
 National Agency for Dams and Transfers (ANBT)
 2018 Review and Design of 20 km of Water Transfer & Irrigation Network in Deir El Ahmar Region – North Bekaa - Lebanon - Review of old studies to supply hill lakes and agricultural lands
- Detailed Design of Water Transfer Pipe and Irrigation Network - 20Km
- Preparation of tender documents
 International Labor Organization (ILO)
 2017-Present Supervision of water networks and reservoirs execution works in many villages in the Bekaa – South – North Lebanon regions Supervision of water networks execution works in at least 12 villages in the Bekaa – South
– North Lebanon regions (> 200 km).
Supervision of water reservoirs.
 Ministry of Energy and Water (MoEW)
 2017-Present Water Resources Management and Master Plan for Potable and Irrigation Water Projects, Distribution Networks, Reservoirs and Hill Lakes in Ainata and Deir El Ahmar Areas - Baalbeck - Bekaa - Lebanon - Water Resources Management Master Plan for the storage and distribution of potable and irrigation water for 23 villages/districts.
- Detailed Design of the works related to the springs catchment arrangements and the construction of wells.
- Detailed Design of the transmission lines and potable Water distribution networks.
- Detailed Design of the transmission lines and channels as well as the distribution of irrigation water.
- Detailed Design of Hill lakes and reservoirs
- Preparation of the Tender Documents.
Public Authority of Electricity and Water (PAEW)
 2017 Design Review Services of Nakhal, Awabi & Wadi Al Ma'awil Distribution Network - Sultanate of Oman Design Review Report including update of population, networks and pumping stationsc (approx. 150 km) Public Authority of Electricity and Water (PAEW)
 2015-present Supervision of water networks execution works in many villages in the Bekaa – South – Mount Lebanon regions Supervision of water networks execution works in at least 10 villages in the Bekaa – South
– Mount Lebanon regions (approx. 150 km)
Ministry of Energy and Water (MoEW)
 2014-2018 Water Projects in Wadi Khaled, Akroum, Kfartoun, Mhamara, El Sahle, Qonia and El Kobbeh North Lebanon" - Lebanon -- Feasibility study of the proposed projects including a detailed description of the works, detailed study and preparation of the execution drawings for the supply pipes, wells, reservoirs and pumping stations. Complete tender documents for the implementation of a potable water system in Wadi Khaled, Akroum, Kfartoun, Mhamara, El Sahle, Qonia and El Kobbeh;
-Supervision of the construction works
 Economic and Social Fund for Development (ESFD)
 2011-2012 Water distribution network for Wilayats of Nakhal, Awabi & Wadi Al Maawil in Al-Batinah region- Sultanate of Oman  Detailed design and preparation of tender documents for the following works: Distribution and installation of 115km of existing HDPE networks with diameters between 110 and 355 mm. Distribution and installation of 115km for new regions 290km of HDPE pipes with diameters between 110 and 355mm
-Horizon: 2040, Population: 78,500 inhabitants
Public Authority of Electricity and Water (PAEW)
 2011 Drinking water supply for the villages of Hadesh and Wadi Mistal in Wilayat Nakhal , Al-Batinah region - Sultanate of Oman Detailed design and preparation of tender documents for the following works:
- Construction of two pumping stations, supply and installation, of two HDPE tanks of 5000 gallons each for each station.
- Supply and installation,
For each station, two HDPE distribution tanks of 5000 gallons each, near the village of Hadesh, a pipe 1705m ND 100 cast iron between PS1 and PS2, a pipe 815m ND 100 cast iron between PS2 and the reservoir, 2 vertical pumps: Q = 3.1 l/s with H = 230 [13 KW] for each pumping station, 1000 m of ductile iron ND 110.
- Horizon: 2035, Population: 150 inhabitants
Public Authority of Electricity and Water (PAEW)
 2010-2011 Water distribution networks for Rustaq, South Al Batinah region - Sultanate of Oman 90 km of primary distribution networks [cast iron pipe ND 100 to 400], 400 km of local distribution networks [cast iron pipes ND 400 to 800, HDPE OD 110 to 355], 8 tanks with their service buildings [ 250 to 2,500 m³], 11 raised tanks [C = 100 to 300 m³] in, 9 transmission pumping stations, 11 pumping stations for water distribution, 6 tank filling stations
Implementation of a SCADA system for the control and monitoring of the water distribution network within the limits of the components of the system.
Public Authority of Electricity and Water (PAEW)
 2009-2012 Construction supervision of water distribution networks in the city center of Aouana, Jijel, Wilaya of Jijel - Algeria  Construction works supervision for the drinking water works in the urban centers of El Aouana - Jijel from the Kisser dam in the Wilaya of Jijel
The project consists of: Transmission line of the Kisser dam treatment station (Length 500m, diameter 900mm, capacity 100,000m³ / day), Treatment plant (capacity 50,000 m³ / day), Pumping station
- Execution of 37,000 m of pipes, Tanks: 2 x 3,000m³
National Agency of Dams and Transfer
 2006-2011 Nabaa el Tasseh spring - Transmission line of Nabatiyeh - Design and Construction supervision - Lebanon Design, review of specifications, evaluation of tenders and construction works supervision. Construction of 30 km of supply lines, rehabilitation of reservoirs, 40 km of distribution networks, 6,500 domestic connections Council for Development and Reconstruction
 2009-2010 Study and evaluation of potable water infrastructure system in the service of the Bekaa Water Establishment - Lebanon Revision, updating and establishment of a geographical list (GIS) of all existing drinking water works: reservoirs, transmission lines, pumping stations, wells, water sources, treatment and chlorination stations and all civil, mechanical, electrical and instrumentation equipment in the villages of the Bekaa region. GTZ - Liban
 2006-2007 Detailed Design and Preparation of Tender Documents for Water Distribution Networks in Jabal Amel - Lebanon Detailed design and preparation of tender documents.
-Supply and transfer pipes (diameter up to 500 mm - L = 100 km approximately); 14 reservoirs with capacity up to 2000 m3 and 2 water towers with capacity up to 300 m3, 2 pumping stations in Chakra (Q = 11,280 m3 / d, TMH = 240 m, P = 0.6 MW) And Shebaa (Q = 2,000 m3 / d, TMH = 300 m).
Conseil du Développement et de la Reconstruction
 2004-2008 Detailed Study, Preparation of Tender Documents and Construction Supervision for Water Distribution Networks in Bekaa region - Lebanon Detailed design, preparation of tender documents and construction works supervision of the water distribution networks including: Tanks (capacity up to 1000m3), pumping and drinking water supply system in the region of Bekaa (Total length about 18 Km). Council for Development and Reconstruction
 2003-2006 Construction Supervision of Water Distribution Systems and Reservoirs in the Caza of Jezzine - Lebanon Preliminary report, detailed design, tender documents and construction works supervision for drinking water networks, pumping stations and reservoirs with a unit volume of up to 1000 m³, drinking water transfer and distribution network of approximately 30 km, 2 pumping stations including civil works and equipment. Council for Development and Reconstruction
 2002- 2008 Water treatment plant of Chabrouh dam, Lebanon - Design and Construction Supervision Processing and civil works design. Preparation of tender documents and construction works supervision of the treatment plant. Capacity 60,000 m3 / day. Ministry of Energy and Water
 2002-2007 Chabrouh Transfer line - El Aassal Spring, Irrigation - Design and Construction Supervision - Lebanon Detailed design - tender documents and supervision of works for irrigation water transfer with D= 400 mm, L = 2.5 km, TMH = 70 m, Q = 0.1 m3/s from the dam of Chabrouh to an irrigation water distribution basin. Ministry of Energy and Water
 2002-2007 Chabrouh Transfer line - El Aassal Spring, Potable water - Design and Construction Supervision - Lebanon Detailed design - tender documents and supervision of works for a transfer line of D= 800 mm, L = 2.5 Km, TMH = 70m, flow rate = 0.7m3/s for the supply of treated water, Chabrouh to the regional reservoir of Nabba El Aassal. Ministry of Energy and Water
 2002-2006 Transfer line from Laban Spring - Chabrouh (Design and Construction Supervision) - Lebanon Supervision of the different sections of the works: Adduction, well, gallery and siphon. Detailed design: geotechnical investigations and stability analysis, technical specifications and tender documents for a distribution tank (5500 m³); An adducer D = 1000 mm, L = 5.2 km comprising: well of 60 m, gallery D = 3 m, L = 680 m, maximum HMT = 110 m.
In collaboration with Coyne and Bellier, France.
Ministry of Energy and Water
 1996-2002 Second and Third year National Emergency Recovery Program - Water supply consultant engineering services for the Bekaa and North Lebanon" - Lebanon Consultancy services and supervision of the rehabilitation and construction of pumping stations and water treatment plants and water supplies. Council for Development and Reconstruction
 1999-2000 Rehabilitation and renovation of the water treatment plant of Dbayé supplying Beirut - Lebanon Design and rehabilitation works supervision for the existing station at Dbayé (120,000 m3 / day) including the replacement of main equipment (pumps, suppressors, valves).
In association with Emit - Beb - Italy.
Establishment of The Water of Beirut and Mount Lebanon
 1996 - 1997 Design and Supervision of water treatment plant in Badrachine, Egypt Design and construction supervision of the Badrachine drinking water treatment plant (44,000 m3/d). OTV
 1994-1997 First Year National Emergency Recovery Program - Water supply consultant engineering services for the Bekaa region" - Lebanon Consultancy services and supervision of the rehabilitation works of the drinking water network with pumping stations and reservoirs. Council for Development and Reconstruction
 1995 Design of Qaissamani water treatment plant and water distribution network feeding the main regional reservoir serving 20 villages in the Metn Caza, Lebanon Detailed design and tender documents for the supply of drinking water to the regional reservoir and the treatment plant (6,000m3/day). Ministry of Hydraulic and Electrical Resources
 1993 Study of the supply of drinking water, distribution networks, pumping stations and reservoirs in the Hasbaya Caza, Lebanon Preliminary report, detailed design and tender documents for reservoirs, pumping stations including civil works and equipment and drinking water system (approximately 65 km). Ministry of Hydraulic and Electrical Resources
 1993 Design of Water Distribution Networks for Casa of Rachaya and Bekaa West including 19 villages and agglomerations, Lebanon Feasibility study, preliminary report, detailed design and tender documents for reservoirs and pumping stations and all water distribution networks. Ministry of Hydraulic and Electrical Resources
 1991 Design of Masirah Treatment Plant - Sultanate of Oman Detailed design, tender documents of the electromechanical and civil works related to the treatment of the water of the desalination plant. Flow rate 200 m³/h. Kassim establishment - TRAVO MUSCAT - Sultanate of Oman
 1988 Design and Construction supervision of water pumping stations at the People's Palace, Damascus - Syria Detailed desing, tender documents. Station characteristics: Q = 180 m³/h, HMT = 140 m. Oger Lebanon
 1981-1982 Design of Dbayeh Water Treatment Plant - Lebanon Detailed design, process, architecture, civil engineering, tender documents and supervision of the extension works of the current Dbayé water treatment plant feeding Beirut (Capacity 40,000 m3/day) Establishment of The Water of Beirut and Mount Lebanon
 1977-1979 Design of the mineral water bottle station - Tanouf - Sultanate of Oman Detailed design of water intake, station, buildings, sewage treatment plant and various networks. Phase I capacity: 60,000 B/d, Phase II capacity: 120,000 B/d. Building surface = 10,000 m². National Mineral Water Company
 1972 Design of Ain Delbé water treatment plant for the suburbs of Beirut - Lebanon Detailed design and preparation of execution drawings for a primary treatment plant: decantation (capacity 30,000 m3/day) on Nahr Beirut. Ministry of Hydraulic and Electrical Resources

Marine Works

 Year  Name of Project  Characteristics of Project  Client
2017-present Feasibility Study for the Second Phase of Saida Commercial Port Feasibility Study for the Second Phase of Saida Commercial Port
- Preliminary Report
- Detailed Report
- Final Report.
Council for Development and Reconstruction
2016-2017 Design of Rehabilitation of Works for Marine Structure at Jieh Power Plant - Topographic and Bathymetric surveys
- Preliminary Design
- Detailed design and execution drawings
- Tender documents & BOQ
Electricité du Liban
2016-2017 Supervision of the Rehabilitation of Saida Fish Market Supervision of rehabilitation works
-Construction of new toilet
-electrical works.
-Réhabilitation of doors and windows.
-Réhabilitation of roof tiles.
-Interior and exterior Painting
-reinforced concrete works
Ministry of Public Works and Transport
2015-present Supervision of Aadloun Port - Phase 1 and 2 Breakwater and ancilliary works:
- Construction of main breakwater (591 m length, Accropodes protection 16m³, 6m depth, Superstructure).
- Sub-marine excavation.
Ministry of Public Works and Transport
2015-present Supervision of Nahr El Kalb - Holiday beach - Sand Dredging - Lebanon Dredging of 160,000 m3 of sand, in 10 different areas, reaching levels ranging between -5.00m and -3.00m according to the execution drawings in the following locations:
- Inside and at the entrance of the marina of the Holiday Beach.
- Between the two breakwaters: that of the Holiday Beach marina and the Nahr El Kaleb river breakwater.
- At the mouth of the Nahr El Kaleb river.
Ministry of Public Works and Transport
2014-2015 Design of protection of Marine School - Batroun (with physical model) -Topographic and bathymetric surveys
- Preliminary design
- Mathematical modeling on Mike 21.
- 3D physical modeling in the Laboratory of Marine Studies in Alger, Algeria.
- Detailed design and execution drawings
- Tender documents.
Ministry of Public Works and Transport
2012-2015 Supervision of Saida Port (Phase 1) Supervision of works (breakwater, quay and ancilliary works):
- Construction of main breakwater (1km length, Accropodes protection 16m³).
- Construction of secondary breakwater (200 m length, rock protection).
- Construction of quay with 150 m length and depth 10m (free) - excavation depth 15 m.
- Construction of platform behind quay wall (length 150m x width 50 m).
- Sub-marine dredging.
Ministry of Public Works and Transport
2013-2014 Design and Supervision of Qalamoun Port Conception and Supervision of works (breakwater, quay, jetties, buildings and anciliarry works).
Main breakwater length increase of 60m. Rock protection.
Ministry of Public Works and Transport
2012-2014 Design and Supervision of Sand Dredging Works - Ouzaii - Lebanon Dredging of 200,000 m3 of sand, in two areas in order to reach the following levels:
- 4.00m in Zone 1 at the port entrance
- 3.00m in Zone 2
Ministry of Public Works and Transport
2012-2013 Design of Saida Port with Physical Modeling 3D physical modeling in the Laboratory of Marine Studies in Alger, Algeria Ministry of Public Works and Transport
2012-2013 Design of Aadloun Port -Topographic and Bathymetric surveys
- Preliminary Design
- Mathematical Modeling on Mike 21
- Detailed design and execution drawings
- Tender documents
Ministry of Public Works and Transport
2011-2013 Supervision of Nahr El Kalb - Holiday beach - Sand Dredging - Lebanon Dredging of 130,000 m3 of sand, in 16 different areas, reaching levels ranging between -5.00m and -2.00m according to the execution drawings in the following locations:
- Inside and at the entrance of the marina of the Holiday Beach: Areas 1,2,3,4,5,6,7,9,10,11,12, 13 and 14.
- Between the two breakwaters: that of the Holiday Beach marina and the Nahr El Kaleb river breakwater: Area 15.
- At the mouth of the Nahr El Kaleb river: Areas 8 and 16.
Ministry of Public Works and Transport
2011-2012 Design of Dbayeh Port
-Topographic and Bathymetric surveys
- Preliminary Design
- Mathematical Modeling on Mike 21
- Detailed design and execution drawings
- Tender documents
Ministry of Public Works and Transport
2010-2011 Design of Saida Commercial Port Design of Saida Port:
- Coastal and Hydrodynamic modeling and results assessment (MIKE 21)
- Preliminary and final detailed design: port infrastructure (breakwaters, quays, buildings and ancillary works)
- Preparation of Tender documents.
Ministry of Public Works and Transport
2010-2012 Design and Supervision of Aquaibeh Port - Lebanon Conception and Supervision of works (breakwater, quay, jetties, buildings and ancillary Works)
Main breakwater (L = 200m, Material: Accropode: 16 m³).
Ministry of Public Works and Transport
2010-2015 Design and Supervision of Ain El Mreisseh Manara Port - Lebanon Conception and Supervision of works (breakwater, quay, jetties)
Main breakwater (L = 185m, Depth = 11m), Material: Accropode, 16 m³ and armor protection.
(Execution in phases)
Ministry of Public Works and Transport
2009-2012 Supervision of Batroun Port - Lebanon Conception and Supervision of works (breakwater, quay, jetties, buildings and ancillary Works)
Main breakwater (L = 100m, Material: Accropode 16 m³).
Ministry of Public Works and Transport
2009-2013 Design and Supervision of Jal el Baher Port - Lebanon Conception and Supervision of works (breakwater, quay, buildings and ancillary Works)
Main breakwater (L = 156m, Material: underwater concrete blocks).
(Execution in phases)
Ministry of Public Works and Transport
2007-2008 Design and Supervision of Seawater intake and Supply System - Lebanon Detailed design of Intake channel, pumping station and water inlet water reservoir.
(Underwater concrete works and R.C structures)
Cimenterie Nationale S.A.L - Lebanon
2004-2007 Design and Supervision of Dbayeh Port - Lebanon Port infrastructure (breakwater, quay, jetties, buildings and ancillary Works)
Main breakwater (L = 276m, Depth = 9m), Material: Accropode, 16 m³ and 18 m³ and armor protection.
(Execution in phases)
Ministry of Public Works and Transport
2000-2003 Design and Supervision of Ouzai Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 242m, Depth = 10m), Material: Accropode, 16 m³ and armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1998-2002 Design and Supervision of Enfeh Port - Lebanon The design includes:
- Wave data and characteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 292m, Depth = 10m), Material: Accropode, 16 m³ and armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1998-2002 Design and Supervision of Batroun Nord Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 135m, Depth = 8m), Material: Armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1996-2005 Design and Supervision of Ain El Mreisseh Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 260m, Depth = 8m), Material: Accropode, 16 m³ and armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1996-2000 Design and Supervision of Qalamoun Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 311m, Depth = 5m), Material: Armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1996-2000 Design and Supervision of Commercial Port of Jounieh - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Concrete extension of the main jetty (Depth 6m).
(Execution in phases)
Ministry of Public Works and Transport
1995-2006 Design and Supervision of Kfarabida Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
(Execution in phases)
Ministry of Public Works and Transport
1995-2005 Design and Supervision of Bouar Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 278m, Depth = 8m), Material: Accropode, 16 m³ and Armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1995-2003 Design and Supervision of Amchit Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 265m, Depth = 10m), Material: Accropode, 16 m³ and Armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1995-2000 Design and Supervision of Chekka Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 250m, Depth = 8m), Material: Armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1994-2004 Design and Supervision of Aqaibeh Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 272m, Depth = 6m), Material: Accropode, 16 m³ and 18 m³ and Armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1990-2001 Design and Supervision of Abdeh Port - Lebanon The design includes:
- Wave data and caracteristics, currentology.
- Preliminary design.
- Socio-economic study and EIA.
- Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works.
- Supervision of works
Main breakwater (L = 360, Depth = 6 m), Material: Armor protection.
(Execution in phases)
Ministry of Public Works and Transport
1983 South Batroun harbour  - Lebanon Fishing and leisure harbour as well as for the Marine school: 350 m, sea water depth = 9 m. Ministry of Public Works and Transport
1974 Breakwater at Ras Beirut - Lebanon Coast protection (L = 1800 m, depth = 4 to 8 m). Directorate General of urban planning
1973 Design of Saadiyate harbour - Lebanon Preliminary design og leirure harbour (350 m). Ministry of Public Works and Transport
1970 Jounieh harbour - Lebanon Study of sand movement, creation of beaches. Final execution of works to limit sand settling into the fishing harbour. Executive Council of "Grands Projets"
 

 

 

Waste Water

 Year  Name of Project  Characteristics of Project  Client
2018-Present Supervision Services for the Construction of Wastewater Networks and Pumping Stations in Jezzine Caza

Supervision of execution of:
- Wastewater networks and connections in various localities (33 km approximately with diameters from 200mm to 400mm).
- Pumping stations and pumping lines in the following localities:
- Hidab (Capacity=3l/s, TMH=38m): to connect to Hidab/Saidoun main collector
- Saidoun (Capacity=1.5l/s, TMH=40m): to connect to Saidoun main collector
- Maknouniyeh (Capacity=2l/s, TMH=42.5m): to connect to wastewater line from Maknouniyeh to Qaitouleh Wastewater Treatment Plant

Council for Development and Reconstruction
2018-Present Environmental and Social Impact Assessment (ESIA), Design, Tender Documents Preparation and Tender Assistance for Bisri Catchment Wastewater Project - South Lebanon and Chouf - Lebanon

The project covers the wastewater systems within Bisri Dam Upper Catchment area. The studied components can be summarized as follows:
- Networks and House Connections for an estimated total length up to 100 Km.
- Collection component
- Sewage Treatment Plants (STPs) component (7 STPs with estimated residents from 1,000 to 60,000 per STP in 2040)
The services inlcude:
- Work, Budget & Quality Plans, Inception Report and Prequalification Documents
- Master Plan Study
- Data Collection, survey, Investigation, Testing, and 50% Design Report
- ESIA Study
- Design and Tender Documents (DBO basis) for the Sewage Treatment Plants
- Design and Tender Documents for the Pumping/lifting Stations, Collectors & Networks
- Expropriation Documents

Council for Development and Reconstruction
2018-Present Supervision of Wastewater Works in Koura Caza, North Lebanon

Supervision of construction of wastewater conveyors of about 31.5 km long for diameter ranging from 200mm to 1500mm in Batroumine, Deddeh, Ras Masqa, Qalamoun and Tripoli in addition to lateral sewers in Batroumine area.

Council for Development and Reconstruction
2018-Present Supervision of Construction of Sea Outfall in Tabarja Keserouan - Lebanon

Supervision of Construction of Emergency Sea Outfall in Tabarja:
- Diameter 1000 mm
- Length 400 m with diffuser

Council for Development and Reconstruction
2017-Present Detailed Engineering Design and Preparation of Tender Documents for the Wastewater Systems in Chouf CAZA – Menassef – Jisr el Kadi – Deir el Kamar and Beit el Dine – Zones 5 -6mB & 7

Establishment of wastewater networks and WWTPs in Zones 5-6mB (Maaser Beiteddine, Beiteddine, Deir el Qamar, Baaqline, Dardourite, Ouadi Dardourite, Ouadi Bnahley, Ouadi ed Deir, Kfarhim, Dmit el Borraniyye, Serjbal , Benouati and Jahliyye) and Zone 7 (Aammiq, Knaisse, Deir Kouche, Bchetfine, Kfarfaqoud, Deir Baba, Dmit el Jouaniyye) of the Chouf (two WWTPs, one biofilter WWTP in Serjbal-capacity 61,500 PE in 2035 and 92,250 PE in 2050 and one WWTP in Deir Baba--capacity 17,500 PE in 2035 and 26,500 PE in 2050). The works include:
- Inception report,
- Topographic survey and geotechnical investigation
- Preliminary Design Report,
- Detailed Design of networks and conceptual design-build of WWTPs
- Tender documents preparation
- Assistance during tendering.

Council for Development and Reconstruction
2017-Present Feasibility Study and Environmental Impact Assesment (EIA) for the collection and Treatment of Wastewater System in Aley Region (Zone 8 and 9) - Lebanon

-Feasibility Study
- Environmental and Social Impact Assesment
- Financial and economical analysis
- Preliminary design of the main sewer lines and collector lines
- Preliminary design of the activated sludge WWTPs in Maasriti (65,000 PE in horizon 2035) and Charoun (15,000 PE in Phase I horizon i.e. year 2044)

Council for Development and Reconstruction
2016-2017 Environmental Management Plan and analysis of alternatives for the execution of the wastewater pumping station at the south-western corner of plot 2146-Jiyye)

Environmental Management Plan and analysis of alternative as per the Ministry of Environment Decision 8633/2012

Council for Development and Reconstruction
2015-2016 Detailed Design and Preparation of Tender Documents for Wastewater Networks to be Connected to Saida and Nabatieh Wastewater Treatment Plants - Lebanonc

Data collection in coordination with municipalities and various concerned authorities, topographical surveys, design and tender documents preparation for wastewater networks for approximately 70 localities

Ministry of Energy and Water
2015-2016 Updating of the Master Plan, Preparation of the Feasibility Study, Environmental Impact Assessment (EIA), Detailed Design and Preparation of Tender Documents for Wastewater Systems in Multiple Watersheds in Jezzine Caza - Lebanon

Master Plan, feasibility study and environmental impact assessment for the following basins :
- Basin downstream Bisri Dam including 15 localities
- South-Eastern Basin of Jezzine including 9 localities
Revision of existing studies, detailed designs and tender documents preparation for wastewater projects in Jezzine and various localities. Evaluation of Contractor's offers.

Council for Development and Reconstruction
2015-present Feasibility Study and Environmental and Social Impact Assessment (ESIA) for Wastewater Systems and Treatment Plants in Aley Region (Gharb and Chahhar Region, Part of zone 7), Aley, Lebanon

-Feasibility Study
- Environmental and Social Impact Assesment
- Financial and economical analysis
- Preliminary design of the main sewer lines and collector lines
- Preliminary design of the activated sludge WWTPs in Mejdlaya (66,000 PE in horizon 2050) and Bchetfine (30,000 PE in horizon 2050)

Council for Development and Reconstruction
2015 Detailed Engineering Design and Preparation of Tender Documents for the Emergency Sea outfall in Keserouane - Lebanon

Detailed design and tender documents preparation for the construction of the Emergency Sea Outfall in Tabarja (lenght 400 m with diffuser), including rehabilitation of the existing Jounieh pumping station and its connection to the outfall.

Council for Development and Reconstruction
2015 Environmental and Social Impact Assessment (ESIA) for Ghazir Wastewater Treatment Plant and Ghazir pumping station PS4– Kesrouan - Lebanon

- An Environmental and Social Impact Assessment (ESIA) for the Ghazir WWTP (upflow bioereactors “biofilters” process, capacity 320,000 PE in horizon 2040) and the Ghazir PS4 pumping station. The ESIA has taken into account the presence of the WWTP and pumping station within a sensitive touristic area comprising the Casino du Liban and the Jounieh bay as as well bathing zones. The impacts and mitigation of the overflow of the WWTP and pumping station have also been addressed in this respect./span>

Council for Development and Reconstruction
2014-2015 Feasibility Study and Environmental and Social Impact Assesment (ESIA) for the wastewater projects of the Chouf (Manassef, Jisr el Qadi, Deir el Qamar – Baaqline – Beit Eddine) region

- Feasibility Study
- Environmental and Social Impact Assesment
- Financial and economical analysis
- Preliminary design of the main sewer lines and collector lines
- Preliminary design of the WWTP in Serjbal (upflow bioreactor – 66,000 PE in horizon 2040) and Dmit el Jouaniyye (activated sludge – 20,000 Equivalent habitants in horizon 2040)

Council for Development and Reconstruction
2012-2013 Supervision Services for the Execution of Kfarkatra Wastewater Network

Supervision of construction works of wastewater network including house connections

Council for Development and Reconstruction
2011-Present Supervision Services for Construction of Wastewater Networks in the regions of Barouk, Fraidis, Ain Zhalta, Nabaa El-Safa, El-Azounieh and Ain Dara and for Design, Construction and Operation & Maintenance of Wastewater Treatment Plants in Nabaa El-Safa and Barouk - Lebanon

- Technical assistance, approval of shop drawings and supervision of execution works for wastewater networks
- Technical assistance, approval of detailed design and shop drawings, and supervision of execution works for wastewater treatment plant

Council for Development and Reconstruction
2012-Present

Supervision Services for the Execution of the Wastewater Treatment Plant in Kfarkatra Village - Lebanon

- Technical assistance, revision and control of shop drawings for the execution of the wastewater treatment plant of Kfarkatra  Council for Development and Reconstruction
2012-Present

Supervision Services for the Rehabilitation Works and Operation and Maintenance of Wastewater Treatment Plants in Jdeideh El-Chouf, Ainbal, and Gharifeh (Sweijeni Municipalities – Chouf caza) - Lebanon

- Technical assistance, revision and control of execution of shop drwaings for the three wastewater treatment plants of Jdeidet-el -Chouf, Ainbal and Gharife (Municiplaities of Sweijeni) as well as the execution of the wastewater networks Council for Development and Reconstruction
2011-2014

Consulting services for “Jeita Spring Protection Project” (study and supervision works) -Jeita Spring Watershed Area

- Detailed design of wastewater network “Jeita spring watershed"on.
- Preparation of detailed tender documents, technical specifications, bills of quantities and drawings for the network and wastewater treatment plant

Council for Development and Reconstruction
1998-2006
Extension 2008

Master Plan and Programme of the Wastewater Treatment Plants in the Chouf and Sawfar Regions - Lebanon

 Detailed design of the wastewater networks and stormwater drainage networks including a length of 70Km and lifting stationlevage. Council for Development and Reconstruction
2011-2012

S"Réalisation d’une étude portant définition de schémas directeurs d’assainissement dans 3 Fédérations du Sud Liban" - Lebanon

 A study of the wastewater masterplan for three Federations in South Lebanon: Jabal Al Rihan, Iklim Al Toufah and Jezzine, in collaboration with the Municipalities of the three Federations, including the following missions:
Mission 1 – Develop an inventory of wastewater systems and quality of resources in the three Federations and diagnostic
Mission 2 – Develop a multi-criteria analysis grid for the development and analysis of wastewater scenarios
Mission 3 – Analyze the demands of Federations in training and small amount equipment in order to re-commission of some wastewater existing utilities
Mission 4 – Develop scenarios of wastewater facilities by basin for the three Federations according to the previously established grid multicriteria
Mission 5 – Develop the master plan for wastewater systems of each Federation, based on the scenarios chosen by Client and the Municipalities representatives
Mission 6 – Study of the establishment of a collegial management structure for wastewater systems in all three federations
Bureau de Cités et Gouvernements Locaux Unis
Liban, Syrie, Jordanie
2010-2013

Design, Preparation of Tender Documents and Assistance during Tendering for BINT JBEIL Wastewater Treatment Plant and Networks - South Lebanon - Lebanon

- Detailed design of wastewater network in Bint Jbeil
- Detailed design of Bint Jbeil wastewater treatment plant (50,000 Equivalent Inhabitant)
- Preparation of detailed tender documents, technical specifications, bills of quantities and drawings for the network and wastewater treatment plant.
Council for Development and Reconstruction
2010-2012

Feasisbility study for the construction of wastewater collection and treatment plant in Jounieh - Kesrouan Caza - Lebanon

Feasibility study and site selection and investigation for:
- Sewage networks
- Coastal interceptor
- Treatment: wastewater treatment plant (WWTP) (around 500,000 population equivalent (PE) in 2020.
- Sea outfall
Council for Development and Reconstruction
2008

Kfarkatra Wastewater Project - Lebanon

- Detailed design of wastewater network for Kfarkatra village
- Preliminary design of Kfarkatra wastewater treatment plant
- Preparation of detailed technical specifications, bills of quantities and drawings for the network and wastewater treatment plant
Municipality of Kfarkatra
2008 Kayfoun Wastewater Project - Aalay - Lebanon - Detailed design of wastewater network for Keyfoun village
- Preliminary design of Keyfoun wastewater treatment plant
- Preparation of detailed technical specifications, bills of quantities and drawings for the network and wastewater treatment plant
Municipality of Keyfoun
2007-2008 "Pearl GTL Project - C8 ETP" - Qatar  Structural and civil engineering study of buildings, hydraulic structures and roads related to the effluent treatment plant in Ras Laffan, gas complex, Qatar:
- 33 reinforced concrete buildings and hydraulic structures dimensions up to 90 meters length.
- Roads networks, potable water and domestic wastewater networks inside the treatment plant.
AL Jaber and Partners
2007-2010 Jbeil wastewater treatment plant - Supervision - Mount Lebanon   Jbeil wastewater treatment plant (Capacity: 50,000 Eq. Inhabitants, Biofilters process) and sea outfall (D = 500 mm, L = 500m)
In collaboration with Cabinet Marc Merlin (France)
Council for Development and Reconstruction
2007-2010 Batroun wastewater treatment plant - Supervision - Northern Lebanon  Batroun wastewater treatment plant (Capacity: 25,000 Eq. Inhabitants, low concentration activated sludge process) and sea outfall (D = 350mm, L = 350m)
In collaboration with Cabinet Marc Merlin (France)
Council for Development and Reconstruction
2005-2007 Sea Outfall for Tripoli Wastewater project - Northern Lebanon  Supervision of sea outfall of Tripoli wastewater treatment plant (D = 1,400 mm, L = 1,600m, Flow = 5m3/s).
In collaboration with Cabinet Marc Merlin (France)
Council for Development and Reconstruction
 2004-2005  Feasibility Study And Environmental Impact Assessment For Bint Jbeil Wastewater Project (Caza Of Bint Jbeil) - Lebanon  Wastewater utilities and treatment facilities for Bint Jbeil and surrounding villages, population served: 25,000 Eq. Inhabitants
Including conversion of drawings into GIS
Council for Development and Reconstruction
 2004-2005 Feasibility Study And Environmental Impact Assessment For Chakra Wastewater Project (Caza Of Bint Jbeil) - Lebanon  Wastewater utilities and  treatment facilities for Chakra, Tibnin and surrounding villages, population served: 30,000 Eq. Inhabitants Council for Development and Reconstruction
 2003-2006 Ras Nabi Younes wastewater treatment plant - Supervision - Mount Lebanon  Ras Nabi Younes wastewater treatment plant (Capacity: 90,000 Eq. Inhabitants, Biofilters process) and sea outfall (D = 500 mm, L = 450m)
In collaboration with Cabinet Marc Merlin (France)
Council for Development and Reconstruction
 2003-2006 Nabatiyeh wastewater treatment plant - Supervision - Southern Lebanon  Nabatiyeh wastewater treatment plant (Capacity: 100,000 Eq. Inhabitants, low activated sludge loading rate process)
In collaboration with Cabinet Marc Merlin (France)
Council for Development and Reconstruction
 2003-2005 Chekka wastewater treatment plant - Supervision - Northern Lebanon  Chekka wastewater treatment plant (Capacity: 24,000 Eq. Inhabitants, low concentration activated sludge process) and sea outfall (D = 300 mm, L = 700m) Council for Development and Reconstruction
 2002-2010 Tripoli wastewater project - Supervision - Northern Lebanon  Tripoli wastewater treatment plant (Capacity: 1 million Eq. Inhabitants, medium concentration activated sludge process, sludge incineration and production of electricity), sea outfall (D = 1,400 mm, L = 1,650m).
In Joint Venture with Cabinet Marc Merlin France (Libanconsult leader of the JV)
Council for Development and Reconstruction
 2001 Design and Supervision of Baadarane Sewerage Network and Wastewater Treatment Plant including sludge treatment (thickening and dehydration) - Lebanon  Sewerage network, population served: 3,000 Eq. Inhabitants Municipality of Baadarane
 2000 Bid analysis for five (5) wastewater treatment plants:  Chekka, Batroun, Jbeil, Chouf, Nabatiyeh - Lebanon  Examination and analysis of the bids for the construction and operation of the following Waste Water Treatment Plants:
- Chekka, activated sludge, 24,000 Eq. Inhabitants (2174 m3/d, DBO5 = 1440 kg/d).
- Batroun, activated sludge, 15000 Eq. Inhabitants (2050 m3/d; DBO5 = 900 Kg/d) with possible extension to 25,000 Eq.Inhabitants
- Jbeil, biofiltres, 32,000 Eq. Inhabitants (5100 m3/d; DBO5 = 1900 Kg/d).with possible extension to 50,000 Eq.Inhabitants
- Chouf, biofiltres, 44, 000 Eq. Inhabitants (5950 m3/d; DBO5 = 2640 Kg/d), with possible extension to 88,000 Eq.Inhabitants
- Nabatiyeh, activated sludge, 68,000 Eq. Inhabitants (10600 m3/d; DBO5 = 4100 Kg/d), with possible extension to 202,000 Eq.Inhabitants
Council for Development and Reconstruction
 1999 Study of Industrial Wastewater Discharges - Protection of the Coastal Areas of Kesrouan (North of Beirut), Sour and Saida (Southern Lebanon) - Lebanon - Inventory of industries, classification by categories, diagnosis visits and characteristics of the discharges
- Identification of necessary pre-treatments
- Committee for regulatory and institutional framework
In association with Cabinet Marc Merlin (France)
Council for Development and Reconstruction
 1998-2006
Extension
2008-2013
Master Plan and Programme of the Wastewater Treatment Plants in the Chouf and Sawfar Regions - Lebanon  Wastewater and stormwater utilities and treatment facilities (including the main collectors) for several localities with a global population of 270,000 Eq. Inhabitants:
- Sewerage networks, 109 Km length
- 24 lift stations
- 16 wastewater treatment plants using various treatment processes
- Capacities varying between 10,000 and 42,000 inhabitants for the Main treatment plants.
Council for Development and Reconstruction
 1994 Sewer networks and sewage treatment facilities for Jezzine - South Lebanon  Preliminary and detailed design, tender documents preparation for networks and pumping stations
Preliminary design of wastewater treatment plant (30,000 Equivalent inhabitants).
Ministry of habitat
 1994 Sewer networks and sewage treatment facilities for Batroun and Suburbs - North Lebanon  Preliminary and detailed design, tender documents preparation for networks and pumping stations
Preliminary design of wastewater treatment plant (20,000 Equivalent inhabitants).
Ministry of habitat
 1993 Sewer networks and sewage treatment facilities for Khyam - South Lebanon  Preliminary and detailed design, tender documents preparation for networks and pumping stations
Preliminary design of wastewater treatment plant (35,000 Equivalent inhabitants).
Ministry of habitat
 1993 Sewer networks and sewage treatment facilities for Roum - South Lebanon  Preliminary and detailed design, tender documents preparation for networks and pumping stations
Preliminary design of wastewater treatment plant (5,000 Equivalent inhabitants).
Ministry of habitat
 1992 Rehabilitation of the sewage treatment plant of Mantes la Jolie - France  Description of the Project Rehabilitation of the sludge treatment process at the wastewater treatment plant of Mantes la Jolie (52,000 Eq. inhabitants).
Description of services - Technical study and design of the rehabilitation of the pre-treatment and the biological reactor ant the supply new aeration equipment (52,000 Eq. Inhabitants).
- Detailed design of the electromechanical works.
- Typical guideline drawings for the civil works.
Design executed by LICOME (subsidiary of Libanconsult in France).
DDE/Ile de France / OTV
 1992 Design of the sewer outlet at the Orly Airport - France  Improvement of out coming flow and treatment of odour
Design executed by LICOME (subsidiary of Libanconsult in France)
Orly Airport/ Oger International
 1991 Sewage treatment plant at Chartres - France  Detailed design of guideline drawings for civil works and electromechanical execution drawings for the wastewater treatment plant of SIAC de LEVES.
Detailed design of the electromechanical works and typical guideline drawings for the civil works pertaining to the rehabilitation of the pre-treatment installations and settling tanks and execution of a new biological reactor
Design executed by LICOME (subsidiary of Libanconsult in France).
SIAC/ Ile de France / OTV
 1991 Rehabilitation of the sludge treatment facilities at the sewage treatment plant of Le Mans - France  Rehabilitation of the sludge treatment process at the wastewater treatment plant of Le Mans (300,000 Eq inhabitants).
Detailed design of the electromechanical works and execution drawings pertaining to the rehabilitation works which consist of the replacement of the filter press by a centrifugal unit, the treatment and removal of odor, as well as the installation of a high pressure pump to feed the sludge incinerator (300,000 Eq Inhabitants).
Design executed by LICOME (subsidiary of Libanconsult in France).
DDE Sarthes / OTV
 1991 Rehabilitation of the sludge treatment facilities at the sewage treatment plant of Strasbourg - France  Rehabilitation of the sludge treatment process at the wastewater treatment plant of Strasbourg (1,000,000 Eq inhabitants).
Detailed design of the electromechanical works and execution drawings pertaining to the rehabilitation works.
Design executed by LICOME (subsidiary of Libanconsult in France).
OTV
 1987 Wastewater treatment plant for the Omayoun Congress Palace - Damascus - Syria  Extended aeration process (Capacity: 2,000 Eq. Inhabitants) Oger Lebanon
 1970 Sewage network and wastewater treatment plant for Anjar - Lebanon  Sewage networks and wastewater treatment plant, consisting of oxidation and stabilization processes. (Capacity: 20,000 Eq. Inhabitants) National Authority for Reconstruction (Now : Ministry of Housing)
 1970 Storm water network system for Beirut North Eastern Suburb - Lebanon  Population served : 150,000 Eq. Inhabitants Ministry of Energy and Water
 1969  Marjayoun wastewater treatment plant - Southern Lebanon  Wastewater treatment plant consisting of oxidation and stabilization processes (Capacity: 20,000 Eq. Inhabitants) National Authority for Reconstruction (Now : Ministry of Housing)
       

Buildings & Various Works

 Year  Name of Project Characteristics of Project  Client
 2011-2013 "Etude et Supervision du Projet Lot I : Routes Agricoles et Infrastructures Hydrauliques dans la Région de Wadi Khaled - Liban Nord" Detailed Engineering Design, Tender Documents preparation and construction supervision services for agricultural roads, irrigation channels and springs rehabilitation in Chadra, Machta Hassan, Machta Hammoud and Mqaibli - Wadi Khaled Region - Akkar - North Lebanon
Project funded by European Union - "Appui au Développement Local dans le Nord du Liban"
Council for Development and Reconstruction
 2008-2011 Rehabilitation of damaged infrastructures caused by the Israeli Invasion in Summer 2006 Detailed Engineering Design, Tender Documents preparation and construction supervision services for the rehabilitation of damaged infrastructures caused by the Israeli Invasion in Summer 2006.
Including conversion of drawings into GIS.
Council for Development and Reconstruction
2003-2007 Landslide (Rock Rupture) in Jezzine - Lebanon Retaining structures and anchors to ensure the stability of major rock formations dominating residential areas. Council for Development and Reconstruction
1985 Compound in Muscat - Sultanate of Oman Design and supervision.
Compound for staff and workers with various networks. Built area: 4,000 m².
Electro-mechanics Company
1982 Technical buildings in Zouk, Ghazir and Baskinta - Lebanon Supervision of civil and electromechanical works. Ministry of Telecommunication
1981 Furniture Showroom in Muscat - Sultanate of Oman Preliminary and detailed design and tender documents for furniture showroom offices, stores and various networks. Built area: 3,000 m².  Office Supplies
1981 Printing press in Muscat - Sultanate of Oman Preliminary and detailed design and supervision of construction of printing press and various networks. Built area: 3,000 m². Oman Printers and Stationers
1978 Compound in Ajman - United Arab Emirates Design and detailed drawings for offices, housing, workshops and various networks. Built area: 6,000 m². TRAVO
1977 Baabda Hospital - Lebanon Supervision of rehabilitation works: civil, electromechanical and sanitary for Baabda Hospital (80 beds). Ministry of Public Works
1977 Mineral water bottling plant in Tanouf - Sultanat of Oman Preliminary and detailed design, execution drawings for equipment and civil works. Technical specifications and tender documents for the water intake, plant, laboratories, treatment plant and various networks.
Supervision of works.
Capacity: 60,000 bottles/day. Built area: 10,000 m2.
National Company for Mineral Water
1974 Scholar complex in Lebanon Preliminary and detailed design and tender documents preparation for the construction of 3 scholar blocs and various networks. Built area = 6,000 m2. Cardinal Patriarche Meouchy Institution
1972 Light Metal Factory in Choueifat - Lebanon Design and execution drawings of reinforced concrete structures.
Built area = 13.000 m². Dimensions: 10x20 m.
Boulos Brothers Society