Year | Name of Project | Characteristics of Project | Client |
2018-Present | Supervision Services for the Construction of Wastewater Networks and Pumping Stations in Jezzine Caza |
Supervision of execution of: |
Council for Development and Reconstruction |
2018-Present | Environmental and Social Impact Assessment (ESIA), Design, Tender Documents Preparation and Tender Assistance for Bisri Catchment Wastewater Project - South Lebanon and Chouf - Lebanon |
The project covers the wastewater systems within Bisri Dam Upper Catchment area. The studied components can be summarized as follows: |
Council for Development and Reconstruction |
2018-Present | Supervision of Wastewater Works in Koura Caza, North Lebanon |
Supervision of construction of wastewater conveyors of about 31.5 km long for diameter ranging from 200mm to 1500mm in Batroumine, Deddeh, Ras Masqa, Qalamoun and Tripoli in addition to lateral sewers in Batroumine area. |
Council for Development and Reconstruction |
2018-Present | Supervision of Construction of Sea Outfall in Tabarja Keserouan - Lebanon |
Supervision of Construction of Emergency Sea Outfall in Tabarja: |
Council for Development and Reconstruction |
2017-Present | Detailed Engineering Design and Preparation of Tender Documents for the Wastewater Systems in Chouf CAZA – Menassef – Jisr el Kadi – Deir el Kamar and Beit el Dine – Zones 5 -6mB & 7 |
Establishment of wastewater networks and WWTPs in Zones 5-6mB (Maaser Beiteddine, Beiteddine, Deir el Qamar, Baaqline, Dardourite, Ouadi Dardourite, Ouadi Bnahley, Ouadi ed Deir, Kfarhim, Dmit el Borraniyye, Serjbal , Benouati and Jahliyye) and Zone 7 (Aammiq, Knaisse, Deir Kouche, Bchetfine, Kfarfaqoud, Deir Baba, Dmit el Jouaniyye) of the Chouf (two WWTPs, one biofilter WWTP in Serjbal-capacity 61,500 PE in 2035 and 92,250 PE in 2050 and one WWTP in Deir Baba--capacity 17,500 PE in 2035 and 26,500 PE in 2050). The works include: |
Council for Development and Reconstruction |
2017-Present | Feasibility Study and Environmental Impact Assesment (EIA) for the collection and Treatment of Wastewater System in Aley Region (Zone 8 and 9) - Lebanon |
-Feasibility Study |
Council for Development and Reconstruction |
2016-2017 | Environmental Management Plan and analysis of alternatives for the execution of the wastewater pumping station at the south-western corner of plot 2146-Jiyye) |
Environmental Management Plan and analysis of alternative as per the Ministry of Environment Decision 8633/2012 |
Council for Development and Reconstruction |
2015-2016 | Detailed Design and Preparation of Tender Documents for Wastewater Networks to be Connected to Saida and Nabatieh Wastewater Treatment Plants - Lebanonc |
Data collection in coordination with municipalities and various concerned authorities, topographical surveys, design and tender documents preparation for wastewater networks for approximately 70 localities |
Ministry of Energy and Water |
2015-2016 | Updating of the Master Plan, Preparation of the Feasibility Study, Environmental Impact Assessment (EIA), Detailed Design and Preparation of Tender Documents for Wastewater Systems in Multiple Watersheds in Jezzine Caza - Lebanon |
Master Plan, feasibility study and environmental impact assessment for the following basins : |
Council for Development and Reconstruction |
2015-present | Feasibility Study and Environmental and Social Impact Assessment (ESIA) for Wastewater Systems and Treatment Plants in Aley Region (Gharb and Chahhar Region, Part of zone 7), Aley, Lebanon |
-Feasibility Study |
Council for Development and Reconstruction |
2015 | Detailed Engineering Design and Preparation of Tender Documents for the Emergency Sea outfall in Keserouane - Lebanon |
Detailed design and tender documents preparation for the construction of the Emergency Sea Outfall in Tabarja (lenght 400 m with diffuser), including rehabilitation of the existing Jounieh pumping station and its connection to the outfall. |
Council for Development and Reconstruction |
2015 | Environmental and Social Impact Assessment (ESIA) for Ghazir Wastewater Treatment Plant and Ghazir pumping station PS4– Kesrouan - Lebanon |
- An Environmental and Social Impact Assessment (ESIA) for the Ghazir WWTP (upflow bioereactors “biofilters” process, capacity 320,000 PE in horizon 2040) and the Ghazir PS4 pumping station. The ESIA has taken into account the presence of the WWTP and pumping station within a sensitive touristic area comprising the Casino du Liban and the Jounieh bay as as well bathing zones. The impacts and mitigation of the overflow of the WWTP and pumping station have also been addressed in this respect./span> |
Council for Development and Reconstruction |
2014-2015 | Feasibility Study and Environmental and Social Impact Assesment (ESIA) for the wastewater projects of the Chouf (Manassef, Jisr el Qadi, Deir el Qamar – Baaqline – Beit Eddine) region |
- Feasibility Study |
Council for Development and Reconstruction |
2012-2013 | Supervision Services for the Execution of Kfarkatra Wastewater Network |
Supervision of construction works of wastewater network including house connections |
Council for Development and Reconstruction |
2011-Present | Supervision Services for Construction of Wastewater Networks in the regions of Barouk, Fraidis, Ain Zhalta, Nabaa El-Safa, El-Azounieh and Ain Dara and for Design, Construction and Operation & Maintenance of Wastewater Treatment Plants in Nabaa El-Safa and Barouk - Lebanon |
- Technical assistance, approval of shop drawings and supervision of execution works for wastewater networks |
Council for Development and Reconstruction |
2012-Present |
Supervision Services for the Execution of the Wastewater Treatment Plant in Kfarkatra Village - Lebanon |
- Technical assistance, revision and control of shop drawings for the execution of the wastewater treatment plant of Kfarkatra | Council for Development and Reconstruction |
2012-Present |
Supervision Services for the Rehabilitation Works and Operation and Maintenance of Wastewater Treatment Plants in Jdeideh El-Chouf, Ainbal, and Gharifeh (Sweijeni Municipalities – Chouf caza) - Lebanon |
- Technical assistance, revision and control of execution of shop drwaings for the three wastewater treatment plants of Jdeidet-el -Chouf, Ainbal and Gharife (Municiplaities of Sweijeni) as well as the execution of the wastewater networks | Council for Development and Reconstruction |
2011-2014 |
Consulting services for “Jeita Spring Protection Project” (study and supervision works) -Jeita Spring Watershed Area |
- Detailed design of wastewater network “Jeita spring watershed"on. - Preparation of detailed tender documents, technical specifications, bills of quantities and drawings for the network and wastewater treatment plant |
Council for Development and Reconstruction |
1998-2006 Extension 2008 |
Master Plan and Programme of the Wastewater Treatment Plants in the Chouf and Sawfar Regions - Lebanon |
Detailed design of the wastewater networks and stormwater drainage networks including a length of 70Km and lifting stationlevage. | Council for Development and Reconstruction |
2011-2012 |
S"Réalisation d’une étude portant définition de schémas directeurs d’assainissement dans 3 Fédérations du Sud Liban" - Lebanon |
A study of the wastewater masterplan for three Federations in South Lebanon: Jabal Al Rihan, Iklim Al Toufah and Jezzine, in collaboration with the Municipalities of the three Federations, including the following missions: Mission 1 – Develop an inventory of wastewater systems and quality of resources in the three Federations and diagnostic Mission 2 – Develop a multi-criteria analysis grid for the development and analysis of wastewater scenarios Mission 3 – Analyze the demands of Federations in training and small amount equipment in order to re-commission of some wastewater existing utilities Mission 4 – Develop scenarios of wastewater facilities by basin for the three Federations according to the previously established grid multicriteria Mission 5 – Develop the master plan for wastewater systems of each Federation, based on the scenarios chosen by Client and the Municipalities representatives Mission 6 – Study of the establishment of a collegial management structure for wastewater systems in all three federations |
Bureau de Cités et Gouvernements Locaux Unis Liban, Syrie, Jordanie |
2010-2013 |
Design, Preparation of Tender Documents and Assistance during Tendering for BINT JBEIL Wastewater Treatment Plant and Networks - South Lebanon - Lebanon |
- Detailed design of wastewater network in Bint Jbeil - Detailed design of Bint Jbeil wastewater treatment plant (50,000 Equivalent Inhabitant) - Preparation of detailed tender documents, technical specifications, bills of quantities and drawings for the network and wastewater treatment plant. |
Council for Development and Reconstruction |
2010-2012 |
Feasisbility study for the construction of wastewater collection and treatment plant in Jounieh - Kesrouan Caza - Lebanon |
Feasibility study and site selection and investigation for: - Sewage networks - Coastal interceptor - Treatment: wastewater treatment plant (WWTP) (around 500,000 population equivalent (PE) in 2020. - Sea outfall |
Council for Development and Reconstruction |
2008 |
Kfarkatra Wastewater Project - Lebanon |
- Detailed design of wastewater network for Kfarkatra village - Preliminary design of Kfarkatra wastewater treatment plant - Preparation of detailed technical specifications, bills of quantities and drawings for the network and wastewater treatment plant |
Municipality of Kfarkatra |
2008 | Kayfoun Wastewater Project - Aalay - Lebanon | - Detailed design of wastewater network for Keyfoun village - Preliminary design of Keyfoun wastewater treatment plant - Preparation of detailed technical specifications, bills of quantities and drawings for the network and wastewater treatment plant |
Municipality of Keyfoun |
2007-2008 | "Pearl GTL Project - C8 ETP" - Qatar | Structural and civil engineering study of buildings, hydraulic structures and roads related to the effluent treatment plant in Ras Laffan, gas complex, Qatar: - 33 reinforced concrete buildings and hydraulic structures dimensions up to 90 meters length. - Roads networks, potable water and domestic wastewater networks inside the treatment plant. |
AL Jaber and Partners |
2007-2010 | Jbeil wastewater treatment plant - Supervision - Mount Lebanon | Jbeil wastewater treatment plant (Capacity: 50,000 Eq. Inhabitants, Biofilters process) and sea outfall (D = 500 mm, L = 500m) In collaboration with Cabinet Marc Merlin (France) |
Council for Development and Reconstruction |
2007-2010 | Batroun wastewater treatment plant - Supervision - Northern Lebanon | Batroun wastewater treatment plant (Capacity: 25,000 Eq. Inhabitants, low concentration activated sludge process) and sea outfall (D = 350mm, L = 350m) In collaboration with Cabinet Marc Merlin (France) |
Council for Development and Reconstruction |
2005-2007 | Sea Outfall for Tripoli Wastewater project - Northern Lebanon | Supervision of sea outfall of Tripoli wastewater treatment plant (D = 1,400 mm, L = 1,600m, Flow = 5m3/s). In collaboration with Cabinet Marc Merlin (France) |
Council for Development and Reconstruction |
2004-2005 | Feasibility Study And Environmental Impact Assessment For Bint Jbeil Wastewater Project (Caza Of Bint Jbeil) - Lebanon | Wastewater utilities and treatment facilities for Bint Jbeil and surrounding villages, population served: 25,000 Eq. Inhabitants Including conversion of drawings into GIS |
Council for Development and Reconstruction |
2004-2005 | Feasibility Study And Environmental Impact Assessment For Chakra Wastewater Project (Caza Of Bint Jbeil) - Lebanon | Wastewater utilities and treatment facilities for Chakra, Tibnin and surrounding villages, population served: 30,000 Eq. Inhabitants | Council for Development and Reconstruction |
2003-2006 | Ras Nabi Younes wastewater treatment plant - Supervision - Mount Lebanon | Ras Nabi Younes wastewater treatment plant (Capacity: 90,000 Eq. Inhabitants, Biofilters process) and sea outfall (D = 500 mm, L = 450m) In collaboration with Cabinet Marc Merlin (France) |
Council for Development and Reconstruction |
2003-2006 | Nabatiyeh wastewater treatment plant - Supervision - Southern Lebanon | Nabatiyeh wastewater treatment plant (Capacity: 100,000 Eq. Inhabitants, low activated sludge loading rate process) In collaboration with Cabinet Marc Merlin (France) |
Council for Development and Reconstruction |
2003-2005 | Chekka wastewater treatment plant - Supervision - Northern Lebanon | Chekka wastewater treatment plant (Capacity: 24,000 Eq. Inhabitants, low concentration activated sludge process) and sea outfall (D = 300 mm, L = 700m) | Council for Development and Reconstruction |
2002-2010 | Tripoli wastewater project - Supervision - Northern Lebanon | Tripoli wastewater treatment plant (Capacity: 1 million Eq. Inhabitants, medium concentration activated sludge process, sludge incineration and production of electricity), sea outfall (D = 1,400 mm, L = 1,650m). In Joint Venture with Cabinet Marc Merlin France (Libanconsult leader of the JV) |
Council for Development and Reconstruction |
2001 | Design and Supervision of Baadarane Sewerage Network and Wastewater Treatment Plant including sludge treatment (thickening and dehydration) - Lebanon | Sewerage network, population served: 3,000 Eq. Inhabitants | Municipality of Baadarane |
2000 | Bid analysis for five (5) wastewater treatment plants: Chekka, Batroun, Jbeil, Chouf, Nabatiyeh - Lebanon | Examination and analysis of the bids for the construction and operation of the following Waste Water Treatment Plants: - Chekka, activated sludge, 24,000 Eq. Inhabitants (2174 m3/d, DBO5 = 1440 kg/d). - Batroun, activated sludge, 15000 Eq. Inhabitants (2050 m3/d; DBO5 = 900 Kg/d) with possible extension to 25,000 Eq.Inhabitants - Jbeil, biofiltres, 32,000 Eq. Inhabitants (5100 m3/d; DBO5 = 1900 Kg/d).with possible extension to 50,000 Eq.Inhabitants - Chouf, biofiltres, 44, 000 Eq. Inhabitants (5950 m3/d; DBO5 = 2640 Kg/d), with possible extension to 88,000 Eq.Inhabitants - Nabatiyeh, activated sludge, 68,000 Eq. Inhabitants (10600 m3/d; DBO5 = 4100 Kg/d), with possible extension to 202,000 Eq.Inhabitants |
Council for Development and Reconstruction |
1999 | Study of Industrial Wastewater Discharges - Protection of the Coastal Areas of Kesrouan (North of Beirut), Sour and Saida (Southern Lebanon) - Lebanon | - Inventory of industries, classification by categories, diagnosis visits and characteristics of the discharges - Identification of necessary pre-treatments - Committee for regulatory and institutional framework In association with Cabinet Marc Merlin (France) |
Council for Development and Reconstruction |
1998-2006 Extension 2008-2013 |
Master Plan and Programme of the Wastewater Treatment Plants in the Chouf and Sawfar Regions - Lebanon | Wastewater and stormwater utilities and treatment facilities (including the main collectors) for several localities with a global population of 270,000 Eq. Inhabitants: - Sewerage networks, 109 Km length - 24 lift stations - 16 wastewater treatment plants using various treatment processes - Capacities varying between 10,000 and 42,000 inhabitants for the Main treatment plants. |
Council for Development and Reconstruction |
1994 | Sewer networks and sewage treatment facilities for Jezzine - South Lebanon | Preliminary and detailed design, tender documents preparation for networks and pumping stations Preliminary design of wastewater treatment plant (30,000 Equivalent inhabitants). |
Ministry of habitat |
1994 | Sewer networks and sewage treatment facilities for Batroun and Suburbs - North Lebanon | Preliminary and detailed design, tender documents preparation for networks and pumping stations Preliminary design of wastewater treatment plant (20,000 Equivalent inhabitants). |
Ministry of habitat |
1993 | Sewer networks and sewage treatment facilities for Khyam - South Lebanon | Preliminary and detailed design, tender documents preparation for networks and pumping stations Preliminary design of wastewater treatment plant (35,000 Equivalent inhabitants). |
Ministry of habitat |
1993 | Sewer networks and sewage treatment facilities for Roum - South Lebanon | Preliminary and detailed design, tender documents preparation for networks and pumping stations Preliminary design of wastewater treatment plant (5,000 Equivalent inhabitants). |
Ministry of habitat |
1992 | Rehabilitation of the sewage treatment plant of Mantes la Jolie - France | Description of the Project Rehabilitation of the sludge treatment process at the wastewater treatment plant of Mantes la Jolie (52,000 Eq. inhabitants). Description of services - Technical study and design of the rehabilitation of the pre-treatment and the biological reactor ant the supply new aeration equipment (52,000 Eq. Inhabitants). - Detailed design of the electromechanical works. - Typical guideline drawings for the civil works. Design executed by LICOME (subsidiary of Libanconsult in France). |
DDE/Ile de France / OTV |
1992 | Design of the sewer outlet at the Orly Airport - France | Improvement of out coming flow and treatment of odour Design executed by LICOME (subsidiary of Libanconsult in France) |
Orly Airport/ Oger International |
1991 | Sewage treatment plant at Chartres - France | Detailed design of guideline drawings for civil works and electromechanical execution drawings for the wastewater treatment plant of SIAC de LEVES. Detailed design of the electromechanical works and typical guideline drawings for the civil works pertaining to the rehabilitation of the pre-treatment installations and settling tanks and execution of a new biological reactor Design executed by LICOME (subsidiary of Libanconsult in France). |
SIAC/ Ile de France / OTV |
1991 | Rehabilitation of the sludge treatment facilities at the sewage treatment plant of Le Mans - France | Rehabilitation of the sludge treatment process at the wastewater treatment plant of Le Mans (300,000 Eq inhabitants). Detailed design of the electromechanical works and execution drawings pertaining to the rehabilitation works which consist of the replacement of the filter press by a centrifugal unit, the treatment and removal of odor, as well as the installation of a high pressure pump to feed the sludge incinerator (300,000 Eq Inhabitants). Design executed by LICOME (subsidiary of Libanconsult in France). |
DDE Sarthes / OTV |
1991 | Rehabilitation of the sludge treatment facilities at the sewage treatment plant of Strasbourg - France | Rehabilitation of the sludge treatment process at the wastewater treatment plant of Strasbourg (1,000,000 Eq inhabitants). Detailed design of the electromechanical works and execution drawings pertaining to the rehabilitation works. Design executed by LICOME (subsidiary of Libanconsult in France). |
OTV |
1987 | Wastewater treatment plant for the Omayoun Congress Palace - Damascus - Syria | Extended aeration process (Capacity: 2,000 Eq. Inhabitants) | Oger Lebanon |
1970 | Sewage network and wastewater treatment plant for Anjar - Lebanon | Sewage networks and wastewater treatment plant, consisting of oxidation and stabilization processes. (Capacity: 20,000 Eq. Inhabitants) | National Authority for Reconstruction (Now : Ministry of Housing) |
1970 | Storm water network system for Beirut North Eastern Suburb - Lebanon | Population served : 150,000 Eq. Inhabitants | Ministry of Energy and Water |
1969 | Marjayoun wastewater treatment plant - Southern Lebanon | Wastewater treatment plant consisting of oxidation and stabilization processes (Capacity: 20,000 Eq. Inhabitants) | National Authority for Reconstruction (Now : Ministry of Housing) |