Year | Name of Project | Characteristics of Project | Client |
2018-Present | Supervision Services for the Construction and Operation of Tripoli Sanitary Landfill for Municipal Solid Waste | Supervision of construction works and operation phase for the: - Implementation of marine protection works (mainly breakwater) - Backfilling of reclaimed marine areas for the implementation of: Tripoli sanitary landfill (approximate area of 60,000 m2) - Construction of sanitary landfill for landfilling of wastes remaining after sorting in the adjacent sorting plant (foreseen capacity of the project 410,000 T, allowing a period of around 3 years of operation) - Operation of the Constructed Sanitary Landfill - Construction and operation of leachate treatment plant - Construction and operation of landfill gas collection and flaring systems - Landfill Closure and caping |
Council for Development and Reconstruction |
2018 | Environmental Management Plan for Bourj Hammoud and Jdaideh Sanitary Landfills | Environmental Management Plan for the following components: - Treatment and removal of the Bourj Hammoud old dump. - Implementation of marine protection works (mainly breakwater) for the marine areas facing Bourj Hammoud and Jdaideh / Baouchrieh / Sedd regions. - Backfilling of reclaimed marine areas for the implementation of: - Temporary sanitary landfills (Bourj Hammoud dump area: 126,400 m2 ; Jdaideh dump area: 122,700 m2 - Foreseen wastewater treatment plant - Public areas allocated for municipal public use by Bourj Hammoud and Jdaideh/ Baouchrieh / Sedd as well as for future marine highway - Relocation and reorganization of existing oil and gas sealines - Construction of temporary sanitary landfills for landfilling of wastes remaining after sorting in Karantina sorting plant and composting in Coral composting plant (current capacity 300 T/d with future extension to 750 T/d). - Construction and operation of two leachate treatment plants in Bourj Hammoud and Jdaideh - Construction and operation of two landfill gas collection and flaring systems in Bourj Hammoud and Jdaideh |
Council for Development and Reconstruction |
2017 | Design of the Solid Waste Sanitary Landfill in Srar - Akkar - Lebanon | - Detailed design, preparation of the detailed execution drawings and tender documents pertaining to the solid waste sanitary landfill in Srar with all necessary leachate extraction and collection networks, leachate pond, biogas extraction and collection, drainage network, administrative and operation buildings, roads and infrastructure networks, landscaping and closure plan. | Council for Development and Reconstruction |
2016-2017 | Environmental Impact Assessment (EIA), Detailed Design and preparation of tender documents for the construction and operation of Bourj Hammoud & Jdaideh sanitary landfills and coordination with fuel and gaz companies for proposition of solutions about their pipes on the site. | - Treatment and removal of the Bourj Hammoud old dump. - Implementation of marine protection works (mainly breakwater) for the marine areas facing Bourj Hammoud and Jdaideh / Baouchrieh / Sedd regions. - Backfilling of reclaimed marine areas for the implementation of: temporary sanitary landfills (Bourj Hammoud dump area: 126,400 m2 ; Jdaideh dump area: 122,700 m2, foreseen wastewater treatment plant, public areas allocated for municipal public use by Bourj Hammoud and Jdaideh / Baouchrieh / Sedd as well as for future marine highway - Relocation and reorganization of existing oil and gas sealines - Construction of temporary sanitary landfills for landfilling of wastes remaining after sorting in Karantina sorting plant and composting in Coral composting plant (current capacity 300 T/d with future extension to 750 T/d). - Construction and operation of two leachate treatment plants in Bourj Hammoud and Jdaideh - Construction and operation of two landfill gas collection and flaring systems in Bourj Hammoud and Jdaideh The works incude: - Environmental Impact Assessment - Detailed design including topographic and bathymetric surveys, geotechnical investigations, detailed designs and drawings - Tender documents (including administrative conditions, technical specifications, bill of quantities and execution drawings), pertaining to the project components stated above. - Physical Scale model in order to verify the stability of marine breakwater as well as overtopping. |
Council for Development and Reconstruction |
2014-2017 | Design and Supervision for the Solid Waste Facility in Bar Elias, Bekaa, Lebanon | Design and Supervision of a Solid Waste Facility in Bar Elias: - Sorting and Composting plant: 150 TPD, Dump area: 37,000 m² - Leachate exctraction and collecttion - Leachate pond: 5,200 m³ - Biofilter Odor Control System |
Economic and Social Fund for Development |
2014-2015 | Design and Supervision of Construction of an Engineered Landfill in Buraimi, Sultanate of Oman | The study consists of a undertaking the detailed design including all execution drawings (civil, electrical, mechanical and architectural) and required technical documents, BOQ and techincal specifications for the sanitary landfill in Buraimi (Governorate of Al Buraimi, Sultanate of Oman). - Dump area: 216,000 m² - Leachate exctraction and collecttion - 2 Leachate pond: 2,500 m³ each - Landfill capacity for phase I: 500,369 m³ - Total Landfill capacity: 2,470,120 m³ |
Oman Environmental Services Holding Company (Be’ah) |
2013-2015 | Supervision of the Closure and Rehabilitation of the Old Dump of Berka Zerga (Annaba) - Algeria | CSupervision of the closure and rehabilitation of the Annaba old dump: - Dump area: 200,000 m², - Leachate extraction and collection, - Biogas collection and incineration (Capacity: 500 Nm³/h), - Geomembrane VLDPE 200,000 m² |
Ministry of Urban Planning and Environment |
2013-2016 | Supervision of the Closure and Rehabilitation of the Old Dump of Zef Zef (Skikda) - Algeria | Supervision of the closure and rehabilitation of the Skikda old dump: - Area: 40,000 m², - Leachate extraction and collection, - Biogas collection and incineration (Capacity: 500 Nm³/h). - Geomembrane HDPE 20,000 m² VLDPE 30,000 m², - Runoff water drainage 550 lm HDPE pipe |
Ministry of Urban Planning and Environment |
2013-Present | Supervision of the closure and rehabilitation of the dump of Ouled Fayet - Algeria | Supervision of the closure and rehabilitation of the Ouled Fayet dump: - Area: 250,000 m² - Leachate extraction and collection (160m³/d), - Biogas collection and incineration (Capacity: 3,000 Nm³/h). - Geomembrane VLDPE 250,000 m² - Runoff water drainage 400 lm HDPE pipe - Trapezoïdal drainage channel 3,800 lm |
Wilaya of Algier – Directorate of Environment |
2009-Present | Supervision of the works of rehabilitation of the old dump of Oued Smar and transformation into green space - Algeria | Supervision of rehabilitation works of the old dump of Oued Smar - Area: 420,000 m², - Leachate treatment (720m³/d), - Biogas extraction and incineration (capacity: 2 x 2,500 Nm³/h), Waste to Energy (WTE) Unit, - Geomembrane VLDPE 430,000 m², - Runoff water drainage 2,500 lm concrete pipe, - Trapezoïdal drainage channel 2,800 lm, |
Ministry of Urban Planning and Environment |
2013 | Design of Rehabilitation of Boulimat (Bejaia) Landfill - Algeria | The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the rehabilitation of Boulimat (Bejaia) Landfill: - Area: 200,000 m² - Biogas extraction and incineration (capacity: 500 Nm³/h), - Geomembrane VLDPE 80,000 m² - Leachate storage & rainwater drainage system -Park and Landscape |
Ministry of Urban Planning and Environment |
2013 | Design of Rehabilitation of 13th Km (Constantine) Landfill - Algeria | The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of 13th Km (Constantine) Landfill: - Area: 60,000 m² - Biogas extraction and incineration (capacity: 250 Nm³/h), - Geomembrane VLDPE 65,000 m² - Leachate storage & rainwater drainage system -Park and Landscape |
Ministry of Urban Planning and Environment |
2013 | Design of Rehabilitation of Bouzourane (Batna) Landfill - Algeria | The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Bouzourane (Batna) Landfill: - Area: 350,000 m² - Geomembrane VLDPE 173,000 m² - Biogas static extraction, rainwater drainage |
Ministry of Urban Planning and Environment |
2013 | Design of Rehabilitation of Mezghitane (Jijel) Landfill - Algeria | The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Mezghitane (Jijel) Landfill: - Area: 65,000 m² - Geomembrane 25,000 m2 - Biogas static extraction, rainwater drainage system - Landscape |
Ministry of Urban Planning and Environment |
2013 | Design of Rehabilitation of Safsaf (Tlemcen) Landfill - Algeria | The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Safsaf (Tlemcen) Landfill : - Area : 100,000 m² - Geomembrane VLDPE 50,000 m2 - Biogas static extraction, rainwater drainage - Landscape |
Ministry of Urban Planning and Environment |
2013 | Design of Rehabilitation of Sidi Haider (Setif) Landfill - Algeria | Etude détaillée, plans d'exécution, étude d'impact sur l'environnement et dossier d'appel d'offres de la Réhabilitation de la Décharge de Sidi Haidar (Setif) : | Ministry of Urban Planning and Environment |
2013 | Design of Rehabilitation of Tigzirt (Tizi Ouzou) Landfill - Algeria | The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Tigzirt (Tizi Ouzou) Landfill: - Area: 40,000 m² - Geotextile 20,000 m² - Biogas static extraction, rainwater drainage system'- Landscape |
Ministry of Urban Planning and Environment |
2012 | Design of Rehabilitation of Tighenif (Mascara) Landfill - Algeria | The scope of works includes the detailed design, execution drawings, environmental impact assessment and tender documents preparation of the Rehabilitation of Tighenif (Mascara) Landfill: - Area: 100,000 m² - Inert waste closure and residential waste collection and transfer - Landscape |
Ministry of Urban Planning and Environment |
2009-2010 | Design and supervision for rehabilitation of waste dumps in the Wilaya of Algiers - Algeria | - Identification of dumps sites - Data Collection and Environmental Impact Assessment studies - Assessment of existing conditions of the dumps - Undertaking on-site survey: topographical survey, geological and geotechnical surveys - Evaluation of the results of the investigation survey, and preparation of drawings and reports illustrating the existing dumps conditions - Carrying out Environmental Impact Assessment studies - Setting up of environmental criteria and feasibility study - Setting up environmental criteria - Carrying out a feasibility study pertaining to the various alternatives for the rehabilitation of the dumps and submission of a preliminary proposal - Detailed design of dump rehabilitation proposal - Submission of specific proposals for dumps rehabilitation - Detailed design of dump rehabilitation - Preparation of tender documents for dumps rehabilitation projects - Supervision of execution of dumps rehabilitation projects |
Ministry of Urban Planning and Environment |
2009-2013 | Supervision , control and monitoring of the construction pertaining to the Sanitary Landfill of Corso - Algeria | - Area: 60 hectares - Leachate treatment plant with a capacity of 80 m³ per day (permeate) - Capacity : 7 Millions Tons |
Ministry of Urban Planning and Environment |
2009-2013 | Supervision , control and monitoring of the construction pertaining to the Sanitary Landfill of Hamici - Algeria | - Area : 110,000 m² - Leachate treatment plant with a capacity of 80 m³ per day (permeate) - Capacity : 2 Millions Tons |
Ministry of Urban Planning and Environment |
2009-Present | Actualisation of the Design and Supervision of the works of rehabilitation of the old dump of Oued Smar and transformation into green space - Algeria. | - Area : 400,000 m² - Leachate treatment plant with a capacity of 720 m³ per day. - Biogaz Extraction and incineration (capacity : 2 x 2,500 Nm³/h) |
Ministry of Urban Planning and Environment |
2008 | Closure and Rehabilitation of the sanitary landfill of Ouled Fayed - Algeria | Evaluation of existing situation, detailed design, execution drawings and tender documents preparation: Dump area: 400,000 m2, Pumping and treatment of leachate (treatment capacity: 160m3/d), captation and treatment of Biogaz (capacity 3,000 Nm3/h) |
Wilaya of Alger - Department of Environment |
2007-2008 | Closure and Rehabilitation of the Old Dump of Zef Zef (Wilaya of Skikda) - Algeria | Evaluation of existing situation, detailed design, execution drawings and tender documents preparation: - Dump area: 40,000 m², - Leachate collection and pumping, - Biogas extraction and incineration (Capacity: 500Nm³/h). |
Ministry of Urban Planning and Environment |
2007-2008 | Closure and rehabilitation of Berka Zerga Landfill (Annaba) - Algeria | Evaluation of existing situation, detailed design, execution drawings and tender documents preparation: - Dump area: 320,000 m², - Biogas extraction and incineration (Capacity: 500Nm³/h). |
Ministry of Urban Planning and Environment |
2007-2008 | Research and Detailed Study of Sanitary Landfills Sites in the Wilaya of Algiers, and Adjacent Wilayas: Reghaia - Algeria | Investigation of potential sites, Environmental impact assessment study, Detailed design and tender documents: - Landfill capacity: 2.5 Million T, - Captation of leachate followed by treatment of 80 m³/d, - Captation and incineration of Biogas. |
Ministry of Urban Planning and Environment |
2007 | Research and Detailed Study of Sanitary Landfills Sites in the Wilaya of Algiers, and Adjacent Wilayas: Hamici -Algeria | Investigation of potential sites, Environmental impact assessment study, Detailed design and tender documents: - Area: 900,000 m2 - Landfill capacity: 10 Million T - Captation of leachate followed by biological and membrane treatment of 80 m³/d (permeate) - Captation and incineration of Biogas. |
Ministry of Urban Planning and Environment |
2006 | Research and Detailed Study of Sanitary Landfills Sites in the Wilaya of Algers, and Adjacent Wilayas: Corso - Algeria | E'Investigation of potential sites, Environmental impact assessment study, Detailed design and tender documents: - Landfill Capacity: 15 Million T - Captation and storage of leachate with treatment with a capacity of 80 m3/day (permeate) - Captation and incineration of Biogas |
Ministry of Urban Planning and Environment |
2006 | Study of the Closure and Rehabilitation of the Old Dump of Oued Smar - Algeria | Detailed design and tender documents (administrative conditions, technical specifications, execution drawings and bill of quantities): - Dump area: 400,000 m² - Leachate treatment via reverse osmosis: 720 m³/d - Geotextile and HDPE geomembrane complex 420,000 m2 and drainage (geogrid) - Biogas extraction and incineration (Capacity: 2x 2,500 Nm³/h). - Stormwater Drainage 2400 m concrete pipe, 2400 m trapezoïdal shaped trench. |
Ministry of Urban Planning and Environment |
2003 | Closure of the Kayale Dump - Lebanon | Closure and rehabilitation of Kayale old dump including proposed mode of Biogas capitation and treatment as well as partial waste transfer. Undertaking the environmental assessment of the closure and rehabilitation of the old dump of Kayale, as well as the detailed design including the description of closure and rehabilitation works, which covers the control of the composition and flow of biogas in view of estimating the existing volume and proposed mode of treatment, the possible partial transfer of wastes towards the sanitary landfill under construction (100,000 Eq. Inhabitants), bill of quantities, etc. |
Council for Development and Reconstruction |
2003 | Construction of Fakiha Transfer Station - Lebanon | Distance between transfer station and sanitary landfill: 50 Km. Undertaking the environmental assessment study of the construction of a solid waste transfer station, as well as the detailed design with description of works, tender documents, bill of quantities, etc. Mobile transfer equipments, capacity 22 T, |
Council for Development and Reconstruction |
2002 | Sanitary landfill adjacent to Tripoli wastewater treatment plant - Lebanon | Landfill pertaining to receive the humid waste and polluted excavation wastes from a coastal dump | Council for Development and Reconstruction |
1998-2002 | Solid Waste Management Project - Detailed Design - Region No. 1A - Lebanon | Preliminary study, EIA, Detailed Design and Tender documents preparation for: 1) Construction of Sanitary landfill of : - Zahlé, Taybeh (Caza Baalbeck), Amioun. 2) Construction of two transfer stations (Caza of Hermel). 3) Collection and the supply of the necessary mobile equipment for the collection, transfer, and street sweeping for: - Zahlé, Baalbeck, Amioun. 4) Operation of the street sweeping for the city of Zahlé. 5) Closure and rehabilitation of the old dump of the city of Zahlé. 6) Closure and rehabilitation of the old dump of the city of Baalbeck (Kayal). |
Council for Development and Reconstruction |
1998-2002 | Solid Waste Management Project - Detailed Design - Region No. 1B - Liban | Preliminary study, EIA, Detailed Design and Tender documents preparation for: - Construction of Sanitary Landfills in Tripoli, Jbeil and Qobayat. '- Supply of Mobile Equipment for the waste collection, street sweeping and landfill operation services. '- Operation of the waste collection and street sweeping services. - Operation of the landfill service. - Closure and rehabilitation of the existing dump in Jbeil. - Closure and rehabilitation of the existing dump in Tripoli. |
Council for Development and Reconstruction |
1998-2002 | Solid Waste Environmental Management Project - Construction and Supply Works - Lebanon | Sanitary landfill of the city of Zahlé (50,000 T/y), supply of mobile equipment for waste collection and street sweeping. | Council for Development and Reconstruction |
1998-2002 | Solid Waste Management Project - Operation Services - Lebanon | The project consists on the supervision of operation, collection, cleaning and different treatment centers for solid waste in Lebanon. Mount Lebanon, North Lebanon and Bekaa. The total treated quantity is 350,000 T/year. (Main landfills: Tripoli, Zahlé). | Council for Development and Reconstruction |
1996 | Rehabilitation, Closure and Operation of the Tripoli Dump - Lebanon | Supervision of civil works Design and supervision of electromechanical works |
Council for Development and Reconstruction |
1995 | Consultant services for a solid waste management plan for Lebanon | Global solid waste management plan for Lebanon (excluding Greater Beirut) - Technical specifications and tender documents preparation for the operation of collection services, roads cleaning including construction, equipment and operation of transfer plants. - Design, typical drawings, technical specifications and tender documents for the construction and operation of landfills. - Technical specifications and tender documents for the furniture of containers, tracks and mobile equipment for transfer plants and landfills. - Impact study of such project on the Country, - Supervision of works |
Council for Development and Reconstruction |
1995 | Environmental Impact Assessment for the Studies for the Implementation of Six Landfills - Lebanon | Etude d'impact sur l'environnement de six sites de décharges contrôlées de capacité variant entre 20,000 et 100,000T/an. | Council for Development and Reconstruction |
1995 | Study to develop a long term strategy for solid waste management in Lebanon - Lebanon | Examen de l'état du secteur des déchets solides et recommandations pour la mise en place d'un plan de gestion de ce secteur au Lebanon en 4 phases : - Phase I : Analyse de la situation existante, - Phase II : Amélioration du secteur, - Phase III : Recommandation pour la récupération des coûts par habitant, - Phase IV : Projet de législation. |
Council for Development and Reconstruction |
1995 | Environmental impact assessment study for an incineration - composting complex at Amroussieh - Lebanon | Environmental Impact Assessment of an existing incineration plant in Amroussieh (72,000T/y) along with a foreseen composting complex (60,000T/y) in conformity with the World Bank specifications. (Operational Directive n° 4.01) |
Council for Development and Reconstruction |
1994 | National Emergency Recovery Program: Consulting Services for Sanitary Landfills - Lebanon | Design and supervision of the first sanitary landfills in differents regions of Lebanon: - Preliminary research for 10 sites, - Detailed final design for the sanitary landfill of Baalback including tender documents preparation, - Design and supervision of Tripoli landfill (110,000T/y). |
Council for Development and Reconstruction |
1994 | Environmental impact assessment study for a solid waste project in Lebanon | Carrying out EIA studies according to the World Bank's O.D. 4.01, for each of the following : - Composting Plant in Saida, - Composting Plant in Zahlé, - Extension of the incineration plant in Amroussieh. |
Council for Development and Reconstruction |
1993 | Design of sanitary landfills throughout 13 cazas - Lebanon | Preparation of Tender Documents, Supervision of works, in joint venture with CREED - France. | Council for Development and Reconstruction |
1992 | National Emergency Recovery Program - Solid Waste: Damage Assessment of the Solid Waste Sector - Lebanon | Evaluation of the existing situation of the Solid waste sector in Lebanon In joint venture with CREED - France |
Council for Development and Reconstruction |
1974 | Solid waste treatment plant in Furn Al Chabbak - Beirut - Lebanon | Detailed design and execution drawings for treatment plant with a capacity of 140T/day. Built area: 4,000 m2. | Municipality of Furn El Chebbak |
1972 | Beirut solid waste treatment plant at Karantina - Beirut - Lebanon | Preliminary Design for a solid waste treatment Plant with capacity of 600 T/day. Built area = 10,000 m². | Municipality of Beyrouth |
1971 | General studies for the solid waste treatment in Lebanon (excluding Beirut and suburbs) | Treatment of solid waste in various Lebanese cities excluding Beirut | Ministry of Public Works, General Directorate of Town Planning. |