Year | Name of Project | Characteristics of Project | Client |
2017-present | Feasibility Study for the Second Phase of Saida Commercial Port | Feasibility Study for the Second Phase of Saida Commercial Port - Preliminary Report - Detailed Report - Final Report. |
Council for Development and Reconstruction |
2016-2017 | Design of Rehabilitation of Works for Marine Structure at Jieh Power Plant | - Topographic and Bathymetric surveys - Preliminary Design - Detailed design and execution drawings - Tender documents & BOQ |
Electricité du Liban |
2016-2017 | Supervision of the Rehabilitation of Saida Fish Market | Supervision of rehabilitation works -Construction of new toilet -electrical works. -Réhabilitation of doors and windows. -Réhabilitation of roof tiles. -Interior and exterior Painting -reinforced concrete works |
Ministry of Public Works and Transport |
2015-present | Supervision of Aadloun Port - Phase 1 and 2 | Breakwater and ancilliary works: - Construction of main breakwater (591 m length, Accropodes protection 16m³, 6m depth, Superstructure). - Sub-marine excavation. |
Ministry of Public Works and Transport |
2015-present | Supervision of Nahr El Kalb - Holiday beach - Sand Dredging - Lebanon | Dredging of 160,000 m3 of sand, in 10 different areas, reaching levels ranging between -5.00m and -3.00m according to the execution drawings in the following locations: - Inside and at the entrance of the marina of the Holiday Beach. - Between the two breakwaters: that of the Holiday Beach marina and the Nahr El Kaleb river breakwater. - At the mouth of the Nahr El Kaleb river. |
Ministry of Public Works and Transport |
2014-2015 | Design of protection of Marine School - Batroun (with physical model) | -Topographic and bathymetric surveys - Preliminary design - Mathematical modeling on Mike 21. - 3D physical modeling in the Laboratory of Marine Studies in Alger, Algeria. - Detailed design and execution drawings - Tender documents. |
Ministry of Public Works and Transport |
2012-2015 | Supervision of Saida Port (Phase 1) | Supervision of works (breakwater, quay and ancilliary works): - Construction of main breakwater (1km length, Accropodes protection 16m³). - Construction of secondary breakwater (200 m length, rock protection). - Construction of quay with 150 m length and depth 10m (free) - excavation depth 15 m. - Construction of platform behind quay wall (length 150m x width 50 m). - Sub-marine dredging. |
Ministry of Public Works and Transport |
2013-2014 | Design and Supervision of Qalamoun Port | Conception and Supervision of works (breakwater, quay, jetties, buildings and anciliarry works). Main breakwater length increase of 60m. Rock protection. |
Ministry of Public Works and Transport |
2012-2014 | Design and Supervision of Sand Dredging Works - Ouzaii - Lebanon | Dredging of 200,000 m3 of sand, in two areas in order to reach the following levels: - 4.00m in Zone 1 at the port entrance - 3.00m in Zone 2 |
Ministry of Public Works and Transport |
2012-2013 | Design of Saida Port with Physical Modeling | 3D physical modeling in the Laboratory of Marine Studies in Alger, Algeria | Ministry of Public Works and Transport |
2012-2013 | Design of Aadloun Port | -Topographic and Bathymetric surveys - Preliminary Design - Mathematical Modeling on Mike 21 - Detailed design and execution drawings - Tender documents |
Ministry of Public Works and Transport |
2011-2013 | Supervision of Nahr El Kalb - Holiday beach - Sand Dredging - Lebanon | Dredging of 130,000 m3 of sand, in 16 different areas, reaching levels ranging between -5.00m and -2.00m according to the execution drawings in the following locations: - Inside and at the entrance of the marina of the Holiday Beach: Areas 1,2,3,4,5,6,7,9,10,11,12, 13 and 14. - Between the two breakwaters: that of the Holiday Beach marina and the Nahr El Kaleb river breakwater: Area 15. - At the mouth of the Nahr El Kaleb river: Areas 8 and 16. |
Ministry of Public Works and Transport |
2011-2012 | Design of Dbayeh Port |
-Topographic and Bathymetric surveys - Preliminary Design - Mathematical Modeling on Mike 21 - Detailed design and execution drawings - Tender documents |
Ministry of Public Works and Transport |
2010-2011 | Design of Saida Commercial Port | Design of Saida Port: - Coastal and Hydrodynamic modeling and results assessment (MIKE 21) - Preliminary and final detailed design: port infrastructure (breakwaters, quays, buildings and ancillary works) - Preparation of Tender documents. |
Ministry of Public Works and Transport |
2010-2012 | Design and Supervision of Aquaibeh Port - Lebanon | Conception and Supervision of works (breakwater, quay, jetties, buildings and ancillary Works) Main breakwater (L = 200m, Material: Accropode: 16 m³). |
Ministry of Public Works and Transport |
2010-2015 | Design and Supervision of Ain El Mreisseh Manara Port - Lebanon | Conception and Supervision of works (breakwater, quay, jetties) Main breakwater (L = 185m, Depth = 11m), Material: Accropode, 16 m³ and armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
2009-2012 | Supervision of Batroun Port - Lebanon | Conception and Supervision of works (breakwater, quay, jetties, buildings and ancillary Works) Main breakwater (L = 100m, Material: Accropode 16 m³). |
Ministry of Public Works and Transport |
2009-2013 | Design and Supervision of Jal el Baher Port - Lebanon | Conception and Supervision of works (breakwater, quay, buildings and ancillary Works) Main breakwater (L = 156m, Material: underwater concrete blocks). (Execution in phases) |
Ministry of Public Works and Transport |
2007-2008 | Design and Supervision of Seawater intake and Supply System - Lebanon | Detailed design of Intake channel, pumping station and water inlet water reservoir. (Underwater concrete works and R.C structures) |
Cimenterie Nationale S.A.L - Lebanon |
2004-2007 | Design and Supervision of Dbayeh Port - Lebanon | Port infrastructure (breakwater, quay, jetties, buildings and ancillary Works) Main breakwater (L = 276m, Depth = 9m), Material: Accropode, 16 m³ and 18 m³ and armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
2000-2003 | Design and Supervision of Ouzai Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 242m, Depth = 10m), Material: Accropode, 16 m³ and armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1998-2002 | Design and Supervision of Enfeh Port - Lebanon | The design includes: - Wave data and characteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 292m, Depth = 10m), Material: Accropode, 16 m³ and armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1998-2002 | Design and Supervision of Batroun Nord Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 135m, Depth = 8m), Material: Armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1996-2005 | Design and Supervision of Ain El Mreisseh Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 260m, Depth = 8m), Material: Accropode, 16 m³ and armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1996-2000 | Design and Supervision of Qalamoun Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 311m, Depth = 5m), Material: Armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1996-2000 | Design and Supervision of Commercial Port of Jounieh - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Concrete extension of the main jetty (Depth 6m). (Execution in phases) |
Ministry of Public Works and Transport |
1995-2006 | Design and Supervision of Kfarabida Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works (Execution in phases) |
Ministry of Public Works and Transport |
1995-2005 | Design and Supervision of Bouar Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 278m, Depth = 8m), Material: Accropode, 16 m³ and Armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1995-2003 | Design and Supervision of Amchit Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 265m, Depth = 10m), Material: Accropode, 16 m³ and Armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1995-2000 | Design and Supervision of Chekka Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 250m, Depth = 8m), Material: Armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1994-2004 | Design and Supervision of Aqaibeh Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 272m, Depth = 6m), Material: Accropode, 16 m³ and 18 m³ and Armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1990-2001 | Design and Supervision of Abdeh Port - Lebanon | The design includes: - Wave data and caracteristics, currentology. - Preliminary design. - Socio-economic study and EIA. - Tender documents and execution drawings of the port infrastructure: breakwater, jetties, quay walls, buildings and ancillary works. - Supervision of works Main breakwater (L = 360, Depth = 6 m), Material: Armor protection. (Execution in phases) |
Ministry of Public Works and Transport |
1983 | South Batroun harbour - Lebanon | Fishing and leisure harbour as well as for the Marine school: 350 m, sea water depth = 9 m. | Ministry of Public Works and Transport |
1974 | Breakwater at Ras Beirut - Lebanon | Coast protection (L = 1800 m, depth = 4 to 8 m). | Directorate General of urban planning |
1973 | Design of Saadiyate harbour - Lebanon | Preliminary design og leirure harbour (350 m). | Ministry of Public Works and Transport |
1970 | Jounieh harbour - Lebanon | Study of sand movement, creation of beaches. Final execution of works to limit sand settling into the fishing harbour. | Executive Council of "Grands Projets" |